REPUBLIC OF ZAMBIA
MINISTRY OF MINES AND MINERALS DEVELOPMENT
MINING CADASTRE DEPARTMENT
PUBLIC NOTICE
SUBJECT: RESULTS OF THE 83RD MINING LICENSING COMMITTEE (MLC) MEETING HELD ON 30TH OCTOBER, 2024
THE MINING CADASTRE DEPARTMENT WISHES TO INFORM THE GENERAL PUBLIC THAT THE RESULTS OF THE 83RD MINING LICENCING COMMITTEE MEETING ARE NOW OUT AND AVAILABLE AT MINING CADASTRE DEPARTMENT, ALL REGIONAL BUREAUX (MKUSHI, KITWE, CHIPATA, CHOMA, MANSA AND SOLWEZI) AND THE MINISTERIAL WEBSITE & FACEBOOK PAGES.
THEREFORE, ALL THOSE WHOSE APPLICATIONS WERE CONSIDERED DURING THE MEETING ARE HEREBY ADVISED AS FOLLOWS;
- SUCCESSFUL APPLICANTS MUST COLLECT OFFER LETTERS FROM OUR REGISTRY AND PAY THE APPLICABLE AREA CHARGES AND MEET ANY OTHER CONDITION(S) (AS THE CASE MIGHT BE) WITHIN THE STIPULATED WINDOW PERIOD AS ACKNOWLEDGMENT OF ACCEPTANCE OF THE OFFER;
- DEFERRED APPLICANTS MUST PROVIDE THE REQUESTED INFORMATION WITHIN THE STIPULATED WINDOW PERIOD OR MUST EXPLAIN, IN WRITING TO THE DIRECTOR OF MINING CADASTRE, THE STEPS THEY ARE TAKING TO ENSURE THE NECESSARY INFORMATION IS PROVIDED TO ENABLE COMPLETION OF THE LICENCING PROCESS; AND
- REJECTED APPLICANTS, WHO INTEND TO APPEAL AGAINST THE DECISION OF THE MINING LICENCING COMMITTEE MUST EXERCISE THEIR RIGHT OF APPEAL IN ACCORDANCE WITH THE PROVISION OF SECTION 97 OF THE MINES AND MINERALS DEVELOPMENT ACT NO. 11 OF 2015 WITHIN THE STIPULATED WINDOW PERIOD.
ALL APPLICANTS ARE ADVISED TO TAKE NOTE OF THE “WINDOW PERIOD” WITHIN WHICH THE OFFER IS VALID, INFORMATION MUST BE PROVIDED (IN CASE OF DEFERRED APPLICATIONS) OR THE APPEAL MUST BE MADE (IN CASE OF REJECTED APPLICATIONS).
APPLICANTS SHOULD FURTHER TAKE NOTE THAT, AT THE EXPIRY OF THE RESPECTIVE “WINDOW PERIODS” THE DEPARTMENT WILL PROCEED AS FOLLOWS;
- OUTSTANDING OFFERS WILL BE TREATED AS REJECTED/LAPSED AND THE SUBJECT AREAS WILL, ACCORDINGLY, BE CLEARED FOR THE PURPOSE OF RECEIPT OF FRESH APPLICATIONS;
- OUTSTANDING DEFERRED APPLICATIONS, WITHOUT ACCEPTABLE WRITTEN EXPLANATIONS, AS DIRECTED ABOVE, WILL BE PRESENTED IN THE NEXT MINING LICENCING COMMITTEE MEETING FOR POSSIBLE REJECTION; AND
- ALL AREAS SUBJECT TO REJECTED APPLICATIONS, WITHOUT PENDING APPEALS TO THE MINISTER, WILL BE TREATED AS AVAILABLE FOR FRESH APPLICATIONS AND WILL, ACCORDINGLY, BE CLEARED AS SUCH.
NB: APPROVAL FOR CO-OPERATIVES IS SUBJECT TO SITE VERIFICATION AND CONSENT APPROVAL.
ISSUED BY SECRETARIAT OF MINING LICENSING COMMITTEE
7TH NOVEMBER, 2024 LUSAKA.
LARGE SCALE MINING LICENCE APPLICATIONS | WINDOW PERIOD | ||||||
S/N | PARTIES | COMMODITIES | AREA | MAP REFERENCE | MLC DECISION | CODE | |
1 | 37619-HQ-LML | Rio Resources Zambia Limited (100%) | Au, Cu, Mn, QTZ, Zn | 11215.3600 ha | Central, Serenje; Northern, Mpika | Rejected | 9TH DECEMBER, 2024 |
2 | 37836-HQ-LML | Geomin Coal Energy Limited (100%) | COA | 20267.8100 ha | Southern, Gwembe, Siavonga | Rejected | 9TH DECEMBER, 2024 |
3 | 38673-HQ-LML | Deco Luck Investments Limited (100%) | Au, Co, Cu, Fe, Ni, Zn | 6508.1100 ha | Lusaka, Chongwe, Kafue | Approved | 9TH DECEMBER, 2024 |
4 | 38173-HQ-LML | Dharani Mining Limited (100%) | Co, Cu, Fe, Pb, Zn | 24453.2700 ha | North Western, Kabompo, Mwinilunga | Rejected | 9TH DECEMBER, 2024 |
5 | 38266-HQ-LML | Zambian Anglo Mining Limited (100%) | Al, AMT, Au, Co, COA, Cu, Fe, Li, Mn, Nb, Pb, PGM, QTZ, Sn, Ta | 13463.9200 ha | Central, Mkushi | Rejected | 9TH DECEMBER, 2024 |
6 | 38555-HQ-LML | Muchinga Energy Resources Limited (100%) | COA, U | 19216.2700 ha | Southern, Gwembe, Siavonga | Deferred | 9TH DECEMBER, 2024 |
7 | 38734-HQ-LML | Mohafra Mining Limited (100%) | Au, Co, Cu, Fe, Mn | 1399.5055 ha | Central, Mumbwa | Deferred | 9TH DECEMBER, 2024 |
8 | 38254-HQ-LML | Sonda Resources Limited | Au, Co, Cu, Fe, Mn, Pb, QTZ, REE, Sn, Zn | 4695.1000 ha | Luapula, Mansa | Deferred | 9TH DECEMBER, 2024 |
9 | 39016-HQ-LML | Sendwe Investments Limited | North western, Kasempa | Deferred | 9TH DECEMBER, 2024 | ||
SMALL SCALE MINING LICENCE APPLICATIONS | WINDOW PERIOD | ||||||
S/N | PARTIES | COMMODITIES | AREA | MAP REFERENCE | MLC DECISION | CODE | |
1 | 17777-HQ-SML | Tawakkal Gems Investments Co. Ltd | EM | 148.5138 ha | Copperbelt, Lufwanyama | Rejected | 9TH DECEMBER, 2024 |
2 | 19107-HQ-SML | Chifyalwa Mining Company Limited | EM | 166.5800 ha | Copperbelt, Lufwanyama | Approved | 9TH DECEMBER, 2024 |
3 | 19281-HQ-SML | Lilume E.K.M Investment Limited | Au, Co, Cu, LST, Pb, Sn, Zn | 378.8194 ha | Lusaka, Kafue | Approved | 9TH DECEMBER, 2024 |
4 | 19378-HQ-SML | Nkinsu Gold and Platinum Enterprises Limited (100%) | Au, Cu, PGM | 399.1016 ha | North Western, Mwinilunga | Approved | 9th DECEMBER, 2024 |
5 | 20608-HQ-SML | Mweko Enterprises Limited | AMT | 65.1799 ha | Southern, Kalomo | Deferred | 9th DECEMBER, 2024 |
6 | 21821-HQ-SML | Roads Development Agency (100%) | GRT | 39.8086 ha | Eastern, Katete | Approved | 9th DECEMBER, 2024 |
7 | 21823-HQ-SML | Roads Development Agency (100%) | GRT | 401.0090 ha | Western, Kaoma | Approved | 9th DECEMBER, 2024 |
8 | 25097-HQ-SML | Lwantete Mining Limited | Au, Co, Cu, Fe, Mn | 127.2268 ha | North Western, Mwinilunga | Deferred | 9th DECEMBER, 2024 |
9 | 31615-HQ-SML | La Reine Fleur Limited | AQM, Cu, GAR, QTZ, SiO2, TML | 133.5629 ha | Deferred | 9th DECEMBER, 2024 | |
10 | 31711-HQ-SML | Mabula Mining Company Limited | Au | 347.1638 ha | Lusaka, Chongwe | Deferred | 9th DECEMBER, 2024 |
11 | 31897-HQ-SML | Meloks Agencies Limited | Ag, Au, Co, Cu | 162.0074 ha | Lusaka, Chongwe | Approved | 9th DECEMBER, 2024 |
12 | 34468-HQ-SML | ADYA Enterprises Limited | Cu, Mn | 347.0458 ha | Northern, Mpika | Deferred | 9th DECEMBER, 2024 |
13 | 35121-HQ-SML | Prack Mining Limited | Au, Co, Cu, Cu2CO3(OH)2, Fe, Mn, Zn | 400.7810 ha | Copperbelt, Chililabombwe | Deferred | 9th DECEMBER, 2024 |
14 | 36366-HQ-SML | Tinman Resources Limited | Co, COA, GAR, Mn, QTZ, Sn, Zn | 371.0434 ha | Central, Kapiri Mposhi | Deferred | 9th DECEMBER, 2024 |
15 | 37006-HQ-SML | Stalwart Investments Limited | Au, Cu, Fe, Mn | 317.9650 ha | Western, Kaoma | Deferred | 9th DECEMBER, 2024 |
16 | 37110-HQ-SML | Kaka Eagles Wings Resources Limited (100%) | Co, Fe, Mn, QTZ, SIL, SiO2, TML | 60.4980 ha | Luapula, Mwense | Deferred | 9th DECEMBER, 2024 |
17 | 38560-HQ-SML | Continental Coal Mining Limited (100%) | COA | 45.9500 CU | Southern, Sinazongwe | Deferred | 9th DECEMBER, 2024 |
18 | 07206-HQ-SML | Sunkutu Engineering Contractors Limited | Be3Al2(SiO3)6, EM | 90.4891 ha | Copperbelt, Lufwanyama | Approved | 9th DECEMBER, 2024 |
19 | 19638-HQ-SML | Easy Resources Limited | Ag, Au, Co, Cu | 23.3347 ha | Copperbelt, Ndola | Approved | 9th DECEMBER, 2024 |
20 | 19588-HQ-SML | Mukamandu Mining Limited | Co,Cu | 176.6820 ha | Copperbelt, Ndola | Approved | 9th DECEMBER, 2024 |
21 | 37953-HQ-SML | Twenty Ten Investments Limited | AQM, Co, Cu, Fe, Mn, QTZ | 354.4600 ha | Luapula, Kawambwa | Approved | 9th DECEMBER, 2024 |
22 | 38835-HQ-SML | Katiso Resources Limited (100%) | COA, GRF, W | 389.5200 ha | Central, Serenje | Deferred | 9th DECEMBER, 2024 |
23 | 29908-HQ-SML | Sokotela Investments Ltd | Au, Cu, GRT, LST | 99.0271 ha | Central, Mumbwa | Approved | 9th DECEMBER, 2024 |
ARTISANAL MINING RIGHTS APPLICATIONS | WINDOW PERIOD | ||||||
S/N | PARTIES | COMMODITIES | AREA | MAP REFERENCE | MLC DECISION | CODE | |
1 | 32490-HQ-AMR | Likomba Likomba (100%) | Mn, QTZ | 6.6587 ha | Central, Mkushi | Deferred | 9th DECEMBER, 2024 |
2 | 32498-HQ-AMR | Kanungwe Lusuko Lusuko | Mn, QTZ | 6.6585 ha | Central, Mkushi | Deferred | 9th DECEMBER, 2024 |
3 | 34200-HQ-AMR | Racheal Mutalisha | Ag, Au, Cu, Fe, QTZ | 6.6541 ha | North Western, Mufumbwe | Approved | 9th DECEMBER, 2024 |
4 | 34418-HQ-AMR | Y’hoshua Chibesakunda | AQM, Au, Cu, GAR, QTZ, TML | 3.3101 ha | Eastern, Nyimba | Deferred | 9th DECEMBER, 2024 |
5 | 34446-HQ-AMR | 5 stars Multi Purpose Coopérative Society Limited | Au, Co, Cu, GRT, Mn, QTZ, SDG, SIL, Zn | 6.7130 ha | Luapula, Mansa | Approved | 9th DECEMBER, 2024 |
6 | 34483-HQ-AMR | Godwin Pinyolo (100%) | PYF, TLC | 6.5917 ha | Lusaka, Kafue | Approved | 9th DECEMBER, 2024 |
7 | 34570-HQ-AMR | Jefferson Mulyatila Mwenda | DOL, GRT, SIL | 6.6839 ha | Central, Serenje | Deferred | 9th DECEMBER, 2024 |
8 | 34949-HQ-AMR | Victor Cheelo | GRT, SIL | 6.6311 ha | Central, Kapiri Mposhi | Deferred | 9th DECEMBER, 2024 |
9 | 34969-HQ-AMR | Michael Nkhata (100%) | Ag, Cu, Pb, Zn | 6.6250 ha | Central, Kabwe | Approved | 9th DECEMBER, 2024 |
10 | 35673-HQ-AMR | CHRISTOPHER NAWA | Au, Co, Cu, Mn | 3.3363 ha | Copperbelt, Ndola | Deferred | 9th DECEMBER, 2024 |
11 | 36385-HQ-AMR | Levy Kabunda | Au, Cu, LST, Mn | 6.6167 ha | Central, Mumbwa | Approved | 9th DECEMBER, 2024 |
12 | 36412-HQ-AMR | Hibber Mwelwa | Au, Co, COA, Cu, Zn | 6.7294 ha | Northern, Isoka | Approved | 9th DECEMBER, 2024 |
13 | 36427-HQ-AMR | Tresphor Nkaka | Au, Co, Cu, Fe, LST, QTZ, SIL | 6.7013 ha | Northern, Mpika | Deferred | 9th DECEMBER, 2024 |
14 | 36555-HQ-AMR | Muleya Siandenge | AMT, GYP, QTZ, Sn | 6.5607 ha | Southern, Siavonga | Deferred | 9th DECEMBER, 2024 |
15 | 36712-HQ-AMR | Troy Simutunda | DOL, Fe, Mn, QTZ, SDG, SIL, TML | 6.6679 ha | Central, Serenje | Deferred | 9th DECEMBER, 2024 |
16 | 36725-HQ-AMR | Ivy Mubita (100%) | Au, Co, Cu | 6.6127 ha | Central, Chibombo | Deferred | 9th DECEMBER, 2024 |
17 | 36759-HQ-AMR | Tissa Kasonga | Ag, AQM, Au, Cu, QTZ, TML | 6.6607 ha | Central, Serenje | Deferred | 9th DECEMBER, 2024 |
18 | 36815-HQ-AMR | Rosemary Zulu | 6.6163 ha | Central, Chibombo | Deferred | 9th DECEMBER, 2024 | |
19 | 36816-HQ-AMR | Garistal Ngolofwana (100%) | Ag, Au, Co, Cu, Mn, Pb, Zn | 6.6163 ha | Central, Chibombo | Deferred | 9th DECEMBER, 2024 |
20 | 37122-HQ-AMR | Chimfwembe Kabasa (100%) | Cu, Mn, Zn | 6.6324 ha | Central, Kapiri Mposhi | Approved | 9th DECEMBER, 2024 |
21 | 37346-HQ-AMR | Abigail Mwale (100%) | Au, Co, Cu, DIA, EM, Fe, GEM, LST, Mn, QTZ, TML, Zn | 6.6300 ha | Eastern, Nyimba | Approved | 9th DECEMBER, 2024 |
22 | 37370-HQ-AMR | Alice Muma Garg (100%) | AMT, AQM, Cu, EM, QTZ, TML | 6.6700 ha | North Western, Solwezi | Approved | 9th DECEMBER, 2024 |
23 | 37393-HQ-AMR | Babba Kabaso Mulenga (100%) | Au, Co, Cu, Fe | 6.6700 ha | Copperbelt, Chingola | Deferred | 9th DECEMBER, 2024 |
24 | 37417-HQ-AMR | emmanuel kasongo (100%) | Au | 6.6000 ha | Central, Mumbwa | Approved | 9th DECEMBER, 2024 |
25 | 37455-HQ-AMR | Festus Mukashika (100%) | AQM, Au, Be3Al2(SiO3)6, GRT, LST, QTZ, TML | 6.6200 ha | Eastern, Nyimba | Approved | 9th DECEMBER, 2024 |
26 | 37479-HQ-AMR | Kavula Kahilu (100%) | Au, Cu, Fe, Mn, Zn | 6.6900 ha | North Western, Solwezi | Approved | 9th DECEMBER, 2024 |
27 | 37480-HQ-AMR | Michael Chirwa (100%) | AQM, Au, QTZ, TML | 6.6900 ha | Northern, Mpika | Approved | 9th DECEMBER, 2024 |
28 | 37567-HQ-AMR | Thandizo Lathu Multipurpose Co-operative Society Limited (100%) | AMT, Au, Co, Cu, Fe, Mn, TML | 1.9800 CU | Central, Mumbwa | Deferred | 9th DECEMBER, 2024 |
29 | 37599-HQ-AMR | Lavuponde Multi – Cooperative Society Limited (100%) | AMT, Au, Cu, EM, Fe, Mn | 6.6900 ha | Northern, Mpika | Approved | 9th DECEMBER, 2024 |
30 | 37613-HQ-AMR | humphrey kapaipai (100%) | Ag, AMT, Au, Co, COA, Cu, DIA, EM, Fe, LST, Mn, Ni, Pb, Zn | 6.6600 ha | Copperbelt, Lufwanyama | Approved | 9th DECEMBER, 2024 |
31 | 37630-HQ-AMR | namundela mining co-operative society limited (100%) | AMT, Au, Co, Cu, DIA, EM, Fe, Mn | 6.7100 ha | Northern, Mpika | Approved | 9th DECEMBER, 2024 |
32 | 37635-HQ-AMR | Katuna Makanta (100%) | Co, Cu, Mn, QTZ | 6.6600 ha | Central, Mkushi; Copperbelt, Masaiti | Approved | 9th DECEMBER, 2024 |
33 | 37639-HQ-AMR | Elisa Banda (100%) | Ag, AMT, Au, Co, Cu, EM, Fe, LST, Mn, Ni, Pb, TML, Zn | 6.6400 ha | Eastern, Petauke | Approved | 9th DECEMBER, 2024 |
34 | 37665-HQ-AMR | Shoots chifundo Shangala (100%) | Ag, Al, am, AMT, AQM, Au, CC, Co, COA, Cu, Cu2CO3(OH)2, DIA, DOL, EM, Fe, GAR, GEM, GEM1, Gr tourm, | 3.3400 ha | Copperbelt, Lufwanyama | Approved | 9th DECEMBER, 2024 |
35 | 37690-HQ-AMR | KUTONDATONDA MULTIPURPOSE CO-OPERATIVESOCIETY LIMITED (100%) | Au, Co, Cu, Gravel, Pb | 6.6500 ha | North Western, Mufumbwe | Approved | 9th DECEMBER, 2024 |
36 | 37691-HQ-AMR | laudia itwi (100%) | AMT, AQM, Au, Cu, Fe, Mn | 6.7400 ha | Northern, Luwingu | Approved | 9th DECEMBER, 2024 |
37 | 37807-HQ-AMR | Jimmy Banda (100%) | AMT, AQM, Mn, SIL | 6.6700 ha | Central, Serenje | Approved | 9th DECEMBER, 2024 |
38 | 38091-HQ-AMR | Cikoye Mining Cooperative Society Limited (100%) | AQM, Sn, Ta, TML | 6.5300 ha | Southern, Choma | Approved | 9th DECEMBER, 2024 |
39 | 38224-HQ-AMR | MULENGA CHIKUPULE MULENGA (100%) | AQM, Au, Co, Cu, FLD, QTZ, TML | 6.6200 ha | Eastern, Nyimba | Approved | 9th DECEMBER, 2024 |
40 | 38230-HQ-AMR | dominic chilao (100%) | AQM, Be3Al2(SiO3)6, GEM, MIC, SiO2, TML | 6.7000 ha | Eastern, Chama | Approved | 9th DECEMBER, 2024 |
41 | 38232-HQ-AMR | greyford mwale (100%) | Au, Co, COA, Cu, Mn, Pb, Zn | 6.6200 ha | Central, Kabwe | Approved | 9th DECEMBER, 2024 |
42 | 38233-HQ-AMR | Loveday Mumba (100%) | Au, Co, Cu, Cu2CO3(OH)2, Fe, Mn, Pb, Zn | 6.6755 ha | Copperbelt, Chingola | Approved | 9th DECEMBER, 2024 |
43 | 38239-HQ-AMR | AIGLE MULTI-PURPOSE COOPERATIVE SOCIETY LIMITED (100%) | AMT, Au, Co, Cu, EM, GAR, QTZ, TML, Zn | 6.6600 ha | North Western, Kasempa | Approved | 9th DECEMBER, 2024 |
44 | 38278-HQ-AMR | Justin Pepulani Ndhlovu (100%) | Be3Al2(SiO3)6, DIA, EM | 6.6600 ha | Copperbelt, Lufwanyama | Approved | 9th DECEMBER, 2024 |
45 | 38279-HQ-AMR | Justin Pepulani Ndhlovu (100%) | Au, Co, Cu | 6.6500 ha | North Western, Mufumbwe | Approved | 9th DECEMBER, 2024 |
46 | 38302-HQ-AMR | Uniked Mwanza (100%) | Au, Co, Cu, Fe, Ni | 6.6635 ha | North Western, Kasempa | Approved | 9th DECEMBER, 2024 |
47 | 38304-HQ-AMR | Uniked Mwanza (100%) | Au, Co, Cu, Fe, Zn | 6.6634 ha | North Western, Kasempa | Approved | 9th DECEMBER, 2024 |
48 | 38305-HQ-AMR | Uniked Mwanza (100%) | Ag, Au, Co, Cu, Fe, Ni, Pb, Zn | 6.6634 ha | North Western, Kasempa | Rejected | 9th DECEMBER, 2024 |
49 | 38309-HQ-AMR | NYEMBA SICHALWE (100%) | Au, Co, Cu | 6.7100 ha | Northern, Chinsali | Approved | 9th DECEMBER, 2024 |
50 | 38310-HQ-AMR | Justin Pepulani Ndhlovu (100%) | Au, Co, COA, Cu | 6.5900 ha | Lusaka, Kafue | Approved | 9th DECEMBER, 2024 |
51 | 38311-HQ-AMR | IVWANAJI SINKALA (100%) | Au, Co, Cu | 6.5900 ha | Lusaka, Kafue | Approved | 9th DECEMBER, 2024 |
52 | 38313-HQ-AMR | MILLIOT NGOMA (100%) | Ag, AMT, Au, Co, Cu, Cu2CO3(OH)2, Ni, Zn | 6.6600 ha | Copperbelt, Luanshya | Approved | 9th DECEMBER, 2024 |
53 | 38332-HQ-AMR | Mariot Manda (100%) | Au, Co, Cu, Zn | 6.6200 ha | Lusaka, Chongwe | Approved | 9th DECEMBER, 2024 |
54 | 38353-HQ-AMR | Tissa Kasonga (100%) | AQM, Au, Cu, DOL, Fe, GEM, MIC, QTZ, Ta | 6.6915 ha | Northern, Mpika | Approved | 9th DECEMBER, 2024 |
55 | 38401-HQ-AMR | SINANKUMBI MINING COOPERATIVE SOCIETY LIMITED | AMT, COA, Cu, EM, F, GEM, Sn, TML, W, Zn | 6.5300 ha | Southern, Sinazongwe | Approved | 9th DECEMBER, 2024 |
56 | 38418-HQ-AMR | Funkwe Mushinge (100%) | Ag, Au, Cu, Cu2CO3(OH)2, Fe, Mn, Ni, Pb, Zn | 6.6200 ha | Central, Mkushi | Deferred | 9th DECEMBER, 2024 |
57 | 38419-HQ-AMR | Funkwe Mushinge (100%) | Ag, Au, Co, Cu, Cu2CO3(OH)2, Fe, Pb, Zn | 6.6200 ha | Central, Mkushi | Deferred | 9th DECEMBER, 2024 |
58 | 38451-HQ-AMR | ZEMBA IRVING MWALULA (100%) | Au, Co, Cu, REE | 1.9700 CU | Lusaka, Kafue | Approved | 9th DECEMBER, 2024 |
59 | 38459-HQ-AMR | George Mwale (100%) | Au, COA, Cu, Mn | 6.6600 ha | Central, Mkushi | Approved | 9th DECEMBER, 2024 |
60 | 38462-HQ-AMR | George Mwale (100%) | Au, Co, Cu, Mn, QTZ | 6.6600 ha | Central, Mkushi | Approved | 9th DECEMBER, 2024 |
61 | 38481-HQ-AMR | paul kasuba chipalo (100%) | Au, Co, Cu, Cu2CO3(OH)2, DIA, Fe, Ni, Pb | 6.6500 ha | North Western, Mufumbwe | Approved | 9th DECEMBER, 2024 |
62 | 38487-HQ-AMR | Fatima Chilonga (100%) | Ag, Au, Co, Cu | 6.6200 ha | Lusaka, Chongwe | Approved | 9th DECEMBER, 2024 |
63 | 38490-HQ-AMR | ALBERT KANGU (100%) | Ag, Au, Co, Cu | 6.6200 ha | Lusaka, Chongwe | Approved | 9th DECEMBER, 2024 |
64 | 38491-HQ-AMR | Fatima Chilonga (100%) | Ag, Au, Co, Cu, Ni | 1.9800 CU | Lusaka, Chongwe | Approved | 9th DECEMBER, 2024 |
65 | 38492-HQ-AMR | Fatima Chilonga (100%) | Ag, Au, Co, Cu, Zn | 6.6200 ha | Lusaka, Chongwe | Approved | 9th DECEMBER, 2024 |
66 | 38523-HQ-AMR | Willard Jombi (100%) | Au, Cu, Mn, Ni, Zn | 6.6500 ha | North Western, Kasempa | Approved | 9th DECEMBER, 2024 |
67 | 38524-HQ-AMR | Willard Jombi (100%) | Ag, Au, Co, Cu, Fe, Ni, Pb, Zn | 6.6500 ha | North Western, Kasempa | Approved | 9th DECEMBER, 2024 |
68 | 38525-HQ-AMR | Willard Jombi (100%) | Ag, Co, Cu, Cu2CO3(OH)2, Fe, Mn, Ni, Pb, Zn | 6.6500 ha | North Western, Kasempa | Approved | 9th DECEMBER, 2024 |
69 | 38528-HQ-AMR | Daniel Mwanza (100%) | Ag, Au, Co, Cu, Ni, Zn | 6.6500 ha | North Western, Kasempa | Approved | 9th DECEMBER, 2024 |
70 | 38529-HQ-AMR | Daniel Mwanza (100%) | Ag, Au, Co, Cu, Fe, Mn, Ni, Zn | 6.6500 ha | North Western, Kasempa | Approved | 9th DECEMBER, 2024 |
71 | 38545-HQ-AMR | John Phiri (100%) | AQM, Au, Be3Al2(SiO3)6, Co, Cu, DIA, DOL, EM, Fe, GAR, GRT, Ir, MIC, Mn, Nb, Pd, QTZ, Rh, SDG, SIL, | 6.6900 ha | Northern, Mpika | Approved | 9th DECEMBER, 2024 |
72 | 38556-HQ-AMR | Lonakemu General Dealers (100%) | Au, Co, Cu, KNa2, Mn, Pb, SIL, Zn | 6.7200 ha | Luapula, Mansa | Approved | 9th DECEMBER, 2024 |
73 | 38557-HQ-AMR | John Chibende (100%) | Au, CC, Co, Cu, Cu2CO3(OH)2, KNa2, Mn, Zn | 6.7000 ha | Luapula, Milenge | Approved | 9th DECEMBER, 2024 |
74 | 38566-HQ-AMR | Jimmy Banda (100%) | Fe, Mn, QTZ, SIL | 6.6600 ha | Central, Serenje | Approved | 9th DECEMBER, 2024 |
75 | 38590-HQ-AMR | Mofya Foreman Chikoma (100%) | AQM, Au, Cu, DOL, Fe, MIC, Zn | 1.9900 CU | Eastern, Chipata | Approved | 9th DECEMBER, 2024 |
76 | 38604-HQ-AMR | Nico Zaloumis (100%) | Ag, Au, Co, Cu, EM, Fe, KNa2, Mn, Ni, Pb, Zn | 6.7300 ha | Luapula, Mwense | Approved | 9th DECEMBER, 2024 |
77 | 38628-HQ-AMR | PIYO GREY NDHLOVU (100%) | Ag, Au, Co, Cu, GRT | 6.6000 ha | Lusaka, Chongwe | Approved | 9th DECEMBER, 2024 |
78 | 38632-HQ-AMR | Kennedy Mutambo (100%) | Au, Co, Cu, Fe, Mn, Pb, Zn | 6.7100 ha | Northern, Chinsali | Approved | 9th DECEMBER, 2024 |
79 | 38633-HQ-AMR | Derick Chilumbu | Au | 6.5900 ha | Central, Mumbwa | Approved | 9th DECEMBER, 2024 |
80 | 38634-HQ-AMR | Lukalia Mining Co-operative Society Limited (100%) | Au, Cu, Fe, Gravel, KNa2, Mn, Sand | 6.7100 ha | Luapula, Mansa | Condition Approved | 9th DECEMBER, 2024 |
81 | 38636-HQ-AMR | Besa Kanika (100%) | Ag, Au, CLY, Cu, Fe, Mn, QTZ, Zn | 6.7400 ha | Luapula, Kawambwa | Approved | 9th DECEMBER, 2024 |
82 | 38648-HQ-AMR | nchimunya chimbulu (100%) | Au, COA, Cu, EM, Fe, GYP, Mn, Pb, Sn | 6.6000 ha | Lusaka, Chongwe | Approved | 9th DECEMBER, 2024 |
83 | 38649-HQ-AMR | PATRICIA SELA (100%) | Gravel, LST, Sand | 6.6300 ha | Central, Kabwe | Approved | 9th DECEMBER, 2024 |
84 | 38650-HQ-AMR | Nason Lawrence Mwape (100%) | Cu, Fe, KNa2, Mn, Pb, Zn | 6.7100 ha | Luapula, Mansa | Approved | 9th DECEMBER, 2024 |
85 | 38678-HQ-AMR | David Kaminya (100%) | Au, Co, Cu, Fe, Zn | 6.6200 ha | Lusaka, Chongwe | Approved | 9th DECEMBER, 2024 |
86 | 38679-HQ-AMR | David Kaminya (100%) | Au, Co, Cu, Fe, Zn | 6.6200 ha | Lusaka, Chongwe | Approved | 9th DECEMBER, 2024 |
87 | 38680-HQ-AMR | Faides Syansumo (100%) | Au, Co, Cu, Fe, Zn | 6.6200 ha | Lusaka, Chongwe | Approved | 9th DECEMBER, 2024 |
88 | 38681-HQ-AMR | Sebastian Nyendwa (100%) | Au, Co, Cu, Fe, Zn | 6.6200 ha | Lusaka, Chongwe | Approved | 9th DECEMBER, 2024 |
89 | 38698-HQ-AMR | PIYO GREY NDHLOVU (100%) | Ag, Au, Co, Cu, Zn | 6.6000 ha | Lusaka, Chongwe | Approved | 9th DECEMBER, 2024 |
90 | 38704-HQ-AMR | Fred Muyunda (100%) | Au, Co, Cu, Fe, Mn, Pb, Zn | 6.6400 ha | North Western, Mufumbwe | Approved | 9th DECEMBER, 2024 |
91 | 38705-HQ-AMR | Fred Muyunda (100%) | Au, Co, Cu, Fe, Mn, Pb, Zn | 6.6400 ha | North Western, Mufumbwe | Approved | 9th DECEMBER, 2024 |
92 | 38726-HQ-AMR | Kapanda Maano Multi- Purpose Co-operative Society Limited (100%) | Au, Co, Cu, Mn, Pb, Zn | 6.6200 ha | Central, Kapiri Mposhi | Approved | 9th DECEMBER, 2024 |
93 | 38739-HQ-AMR | Emmanuel Kamanga (100%) | AMT, Au, Co, Cu, Fe, Mn, TML, Zn | 6.6800 ha | Central, Serenje | Deferred | 9th DECEMBER, 2024 |
94 | 38740-HQ-AMR | Emmanuel Kamanga (100%) | AMT, Au, Co, Cu, Fe, Mn, TML | 6.6800 ha | Central, Serenje | Deferred | 9th DECEMBER, 2024 |
95 | 38752-HQ-AMR | John Mwiinga (100%) | Ag, Au, Cu | 6.7000 ha | North Western, Mwinilunga | Approved | 9th DECEMBER, 2024 |
96 | 38801-HQ-AMR | Gift Mulongoti (100%) | Au, Co, Cu | 6.7000 ha | North Western, Mwinilunga | Approved | 9th DECEMBER, 2024 |
97 | 38869-HQ-AMR | Micheal Tilimboyi (100%) | Au | 6.6000 ha | Central, Mumbwa | Approved | 9th DECEMBER, 2024 |
98 | 38905-HQ-AMR | Francis Mwape (100%) | Au, Cu, Cu2CO3(OH)2, Fe, GYP, MIC, Mn, Sand, Ta | 6.5800 ha | Southern, Mazabuka | Approved | 9th DECEMBER, 2024 |
99 | 38950-HQ-AMR | Jones Nkandu (100%) | Au, Co, Cu, Mn, QTZ, Zn | 6.7100 ha | Luapula, Milenge | Approved | 9th DECEMBER, 2024 |
100 | 38951-HQ-AMR | Jones Nkandu (100%) | Au, Co, Cu, Fe, Ni, Pb, QTZ, Zn | 6.7100 ha | Luapula, Milenge | Approved | 9th DECEMBER, 2024 |
101 | 38963-HQ-AMR | Justine Musonda | AMT, Au, Co, Cu, Cu2CO3(OH)2, Fe, LST, Mn, TML | 6.6400 ha | Central, Mkushi | Approved | 9th DECEMBER, 2024 |
102 | 38964-HQ-AMR | Choolwe Bruno Mizinga | Ba, CLY, Cu, F, Fe, FLD, GRT, STN, TLC | 6.5700 ha | Southern, Siavonga | Approved | 9th DECEMBER, 2024 |
103 | 38967-HQ-AMR | audrey mulenga | Au, Co, Cu, Ni, QTZ, Sn | 6.6913 ha | Northern, Mpika | Approved | 9th DECEMBER, 2024 |
104 | 38968-HQ-AMR | Stephen Chongo Mulenga (100%) | Au, Cu, Fe, QTZ | 6.5900 ha | Lusaka, Kafue | Approved | 9th DECEMBER, 2024 |
105 | 38969-HQ-AMR | audrey mulenga (100%) | Au, Cu, Fe, QTZ | 6.5900 ha | Lusaka, Kafue | Approved | 9th DECEMBER, 2024 |
106 | 38977-HQ-AMR | Nosiku Kabinga Pande | Au, Co, Cu, Fe, Ni, Pb, QTZ, Zn | 6.6600 ha | North Western, Kasempa | Approved | 9th DECEMBER, 2024 |
107 | 38985-HQ-AMR | Zabwino-Ndidi Multi-Purpose Co-operative Society Limited (100%) | Au | 6.6000 ha | Central, Mumbwa | Approved | 9th DECEMBER, 2024 |
108 | 38987-HQ-AMR | Zabwino-Ndidi Multi-Purpose Co-operative Society Limited (100%) | Au, Cu | 6.6000 ha | Central, Mumbwa | Approved | 9th DECEMBER, 2024 |
109 | 38988-HQ-AMR | Zabwino-Ndidi Multi-Purpose Co-operative Society Limited (100%) | Au, Cu | 6.6000 ha | Central, Mumbwa | Approved | 9th DECEMBER, 2024 |
110 | 38990-HQ-AMR | Zabwino-Ndidi Multi-Purpose Co-operative Society Limited (100%) | Au, Cu | 6.6000 ha | Central, Mumbwa | Approved | 9th DECEMBER, 2024 |
111 | 39003-HQ-AMR | Brian Kawisha | AMT, DOL, GAR, GRT, QTZ, SDG, TML | 6.6900 ha | North Western, Solwezi | Approved | 9th DECEMBER, 2024 |
112 | 39011-HQ-AMR | Tunjile Multi-Purpose Co-operative Society Limited (100%) | Cu, Cu2CO3(OH)2 | 6.5200 ha | Southern, Kalomo | Approved | 9th DECEMBER, 2024 |
113 | 38733-HQ-AMR | Marian Kapembwa (100%) | Ag, Au, Co, Cu, Fe, Mn, Zn | 6.7300 ha | Luapula, Mwense | Rejected | 9th DECEMBER, 2024 |
114 | 38856-HQ-AMR | Voster Hampako (100%) | GEM, SIL | 6.7000 ha | Luapula, Mansa | Approved | 9th DECEMBER, 2024 |
115 | 38855-HQ-AMR | Faith Mushongo (100%) | GEM, SIL | 6.7000 ha | Luapula, Mansa | Approved | 9th DECEMBER, 2024 |
116 | 38723-HQ-AMR | MALEYA MALEYA (100%) | AMT, Au, Co, Cu, Fe, Ni, Pb, TML, Zn | 6.6000 ha | Lusaka, Chongwe | Approved | 9th DECEMBER, 2024 |
117 | 39027-HQ-AMR | Matatoka Masuzyo (100%) | Au | 6.7100 ha | Northern, Chinsali | Approved | 9th DECEMBER, 2024 |
118 | 39020-HQ-AMR | Katuzumanana Mining Co-operative Society Limited (100%) | Au | 6.6000 ha | Central, Mumbwa | Approved | 9th DECEMBER, 2024 |
119 | 38814-HQ-AMR | Evans Malama | Ag, Au, Co, Cu, Fe,Pb, Zn | 6.5200 ha | Southern, Kalomo | Approved | 9th DECEMBER, 2024 |
MINERAL PROCESSING MINING LICENCE APPLICATIONS | WINDOW PERIOD | ||||||
S/N | PARTIES | COMMODITIES | AREA | MAP REFERENCE | MLC DECISION | CODE | |
1 | 29021-HQ-MPL | Ferro Alloys Corporation Limited | Mn, Pb, SIL | 9.9379 ha | Central, Kabwe | Approved | 9th DECEMBER, 2024 |
2 | 32856-HQ-MPL | Silver creek Mining Limited | Au, Mn | 3.3006 ha | Central, Mumbwa | Deferred | 9th DECEMBER, 2024 |
3 | 34106-HQ-MPL | Havfree International Trade (pty) Limited | Cu | 20.0187 ha | Copperbelt, Kalulushi | Deferred | 9th DECEMBER, 2024 |
4 | 36847-HQ-MPL | Stone Shine Investments Limited (100%) | Cu | 3.3375 ha | Copperbelt, Chingola | Deferred | 9th DECEMBER, 2024 |
5 | 37585-HQ-MPL | LONGCHANG INVESTMENTS LIMITED (100%) | Cu | 20.0200 ha | Copperbelt, Chingola | Deferred | 9th DECEMBER, 2024 |
6 | 37611-HQ-MPL | Virgin Blue Company (100%) | Co, Cu, Cu2CO3(OH)2, Mn, Pb | 6.6700 ha | Copperbelt, Kitwe | Approved | 9th DECEMBER, 2024 |
7 | 37792-HQ-MPL | Silver Grown Investment Limited (100%) | Au | 3.2998 ha | Central, Mumbwa | Deferred | 9th DECEMBER, 2024 |
9 | 38062-HQ-MPL | Afrodiamond Limited (100%) | Au, Cu | 6.6000 ha | Central, Mumbwa | Rejected | 9th DECEMBER, 2024 |
11 | 38064-HQ-MPL | Safe Haven Investments Limited (100%) | Au, Cu | 6.6000 ha | Central, Mumbwa | Rejected | 9th DECEMBER, 2024 |
12 | 38156-HQ-MPL | Ethical Exim Investments Limited (100%) | AL2, Mn | 13.3500 ha | Central, Serenje | Approved | 9th DECEMBER, 2024 |
13 | 38287-HQ-MPL | ONKOT SOLUTIONS LIMITED (100%) | Au, Cu | 6.6016 ha | Central, Mumbwa | Deferred | 9th DECEMBER, 2024 |
14 | 38460-HQ-MPL | Reymans Mining Zambia Limited (100%) | Au | 6.6000 ha | Central, Mumbwa | Deferred | 9th DECEMBER, 2024 |
15 | 38517-HQ-MPL | Real Oil Investment Limited (100%) | Ag, Au, Cu, Fe, Zn | 13.2000 ha | Central, Mumbwa | Deferred | 9th DECEMBER, 2024 |
16 | 38551-HQ-MPL | MUSALE MABWE MINING LIMITED (100%) | Cu | 53.4200 ha | Copperbelt, Chililabombwe | Deferred | 9th DECEMBER, 2024 |
17 | 38553-HQ-MPL | Jesmu Industry Company Limited (100%) | Co, Cu, Cu2CO3(OH)2, Gravel, MS, Sand | 6.6700 ha | Copperbelt, Ndola | Approved | 9th DECEMBER, 2024 |
18 | 38818-HQ-MPL | Hilaac Company Limited (100%) | Au | Deferred | 9th DECEMBER, 2024 | ||
19 | 38600-HQ-MPL | Leixin Renewable Resources Limited (100%) | Au, Cu | 53.4200 ha | Copperbelt, Chililabombwe | Approved | 9th DECEMBER, 2024 |
20 | 38714-HQ-MPL | Faren Mining and Metalllurgy Zambia Company Limited (100%) | Au, Cu | 33.3739 ha | Copperbelt, Chingola | Approved | 9th DECEMBER, 2024 |
21 | 38753-HQ-MPL | Activeone Investment Limited (100%) | Au, Cu, Fe, Sand | 6.6000 ha | Central, Mumbwa | Deferred | 9th DECEMBER, 2024 |
22 | 38776-HQ-MPL | Alphaone Investments Limited (100%) | Ag, Au, Cu, Fe, Sand, Zn | 6.6000 ha | Central, Mumbwa | Deferred | 9th DECEMBER, 2024 |
23 | 38871-HQ-MPL | WALALAHA INVESTMENT LIMITED (100%) | Au, Cu, Fe, Sand, Zn | 26.4100 ha | Central, Mumbwa | Deferred | 9th DECEMBER, 2024 |
24 | 38886-HQ-MPL | DZ Trading and Logistics Company Limited (100%) | Au, Cu | 13.3200 ha | North Western, Kasempa | Deferred | 9th DECEMBER, 2024 |
25 | 38942-HQ-MPL | Kevmich Resources Limited (100%) | Au, Co, Cu | 2.9700 CU | Central, Mumbwa | Deferred | 9th DECEMBER, 2024 |
26 | 39004-HQ-MPL | Habib Bey Logistics Limited | Au | 6.6000 ha | Central, Mumbwa | Deferred | 9th DECEMBER, 2024 |
27 | 38798-HQ-MPL | Divine Booker Limited (100%) | Au | 6.6000 ha | Central, Mumbwa | Approved | 9th DECEMBER, 2024 |
28 | 39010-HQ-MPL | Towhid Trading Limited (100%) | Au | 6.6000 ha | Central, Mumbwa | Deferred | 9th DECEMBER, 2024 |
LARGE-SCALE EXPLORATION LICENCE APPLICATIONS | WINDOW PERIOD | ||||||
S/N | PARTIES | COMMODITIES | AREA | MAP REFERENCE | MLC DECISION | CODE | |
1 | 19808-HQ-LEL | Headframe Resources (Z) Ltd (100%) | Ag, Au, Co, Cu, Fe, Mn, Ni, REE, U, Zn | 8150.3323 ha | Luapula | Deferred | 9th DECEMBER, 2024 |
2 | 20836-HQ-LEL | Designer Rocks Zambia Limited | DOL, LST, MBL | 36138.9786 ha | Central, Chibombo, Kabwe, Kapiri Mposhi | Rejected | 9th DECEMBER, 2024 |
3 | 21506-HQ-LEL | Rockerfield Corporation Limited | Au, Co, Cu, Zn | 2209.3877 ha | North Western, Mufumbwe | Approved | 9th DECEMBER, 2024 |
4 | 21607-HQ-LEL | Kadam Manja Mining Company Limited | Ag, Au, Co, Cu | 3045.0392 ha | Central, Kapiri Mposhi, Mkushi | Rejection | 9th DECEMBER, 2024 |
5 | 22250-HQ-LEL | Armada Minerals Limited | Ag, Au, Co, Cr, Cu, Fe, Mo, Ni, Pb, Pd, Pt, V, Zn | 29207.5279 ha | North Western, Kasempa | approved | 9th DECEMBER, 2024 |
6 | 23137-HQ-LEL | ZCCM – IH Investments Holdings Plc | Co, Cu, LST, SDG, Zn | 3066.8310 ha | Copperbelt, Masaiti, Ndola | Approved | 9th DECEMBER, 2024 |
7 | 26460-HQ-LEL | Family Industries Mining Company Limited | Au, CLY, Co, Cu, F, Fe, MIC, Ni | 5217.7631 ha | Southern, Gwembe | Deferred | 9th DECEMBER, 2024 |
9 | 27051-HQ-LEL | Geiya Mining Limited | Au, Co, Cu, DIA, EM, GRT | 19486.8226 ha | Copperbelt, Kitwe, Luanshya, Lufwanyama, Ndola | Deferred | 9th DECEMBER, 2024 |
10 | 27078-HQ-LEL | Jimukai Mining Company Limited | Cu, EM, QTZ | 11512.0998 ha | North Western, Solwezi | rejected | 9th DECEMBER, 2024 |
11 | 27361-HQ-LEL | Mporokoso Resources Ltd (100%) | Au, COA, Cu, DIA, Fe | 24410.7934 ha | Northern, Mporokoso | Rejected | 9th DECEMBER, 2024 |
12 | 27431-HQ-LEL | Namasu Mining & Trading Company Limited | Au, Co, Cu | 30714.2670 ha | Central, Chibombo, Mumbwa | Rejected | 9th DECEMBER, 2024 |
13 | 27460-HQ-LEL | Chisungusho Investments Limited | Ag, Au, Co, Fe, LST, Mn, Pb, Zn | 1766.2415 ha | Central, Mkushi | Rejected | 9th DECEMBER, 2024 |
14 | 28840-HQ-LEL | Rio Tinto Exploration Zambia Limited | Ag, Au, Co, Cu, Mn, Ni, Pb, REE, Zn | 11222.4075 ha | North Western, Solwezi | Approved | 9th DECEMBER, 2024 |
15 | 29689-HQ-LEL | Zamworld Resources Limited (100%) | Ag, Au, Co, COA, Cu, Fe, Mn, Pb, Zn | 50001.8881 ha | Northern, Mbala, Mpulungu | Deferred | 9th DECEMBER, 2024 |
16 | 29773-HQ-LEL | Zamworld Resources Limited | Co, Cu, Fe, LST, Mn, Pb, QTZ, Zn | 3982.4428 ha | North Western, Kasempa | Deferred | 9th DECEMBER, 2024 |
17 | 30361-HQ-LEL | Doriffa Investment Import and Export Limited (100%) | Au, Co, Cu, Fe, Zn | 3353.7483 ha | Eastern, Lundazi | Rejected | 9th DECEMBER, 2024 |
18 | 30432-HQ-LEL | Imperial Resources Limited | Ag, COA, Cu, Mn, Zn | 66757.9572 ha | North Western, Kabompo; Western, Lukulu | Approved | 9th DECEMBER, 2024 |
19 | 30963-HQ-LEL | Jordan Fresh Farms Limited | Ag, Au, Co, Cu, Zn | 29174.3440 ha | Central, Chibombo, Mumbwa | Approved | 9th DECEMBER, 2024 |
20 | 31013-HQ-LEL | Unicorn Resources Limited | Ag, Au, Be3Al2(SiO3)6, Co, Cu, Fe, Pb, QTZ | 12345.9327 ha | Northern, Mpika | Rejected | 9th DECEMBER, 2024 |
21 | 31051-HQ-LEL | Advait Ferro Limited (100%) | Ag, Au, Co, Cu, EM, Fe, Pb, QTZ | 107493.1453 ha | Central, Serenje; Northern, Mpika | Deferred | 9th DECEMBER, 2024 |
22 | 31086-HQ-LEL | Advait Ferro Limited | Ag, Au, Be3Al2(SiO3)6, Co, Cu, Fe, Mn, Pb, QTZ | 3755.9377 ha | Northern, Mpika | Approved | 9th DECEMBER, 2024 |
23 | 32716-HQ-LEL | Rankin Enineering Consultants | Ag, Au, Cu | 2828.0012 ha | Northern, Kasama, Luwingu | Deferred | 9th DECEMBER, 2024 |
24 | 33503-HQ-LEL | Wise Suppliers Company Limited | Ag, Au, Co, Cr, Cs, Cu, Fe, FLD, GAR, Li, Mn, Nb, Pb, QTZ, Ta, Zn | 33428.0807 ha | Central, Kapiri Mposhi | Approved | 9th DECEMBER, 2024 |
25 | 33574-HQ-LEL | Kanangu Brothers Investments Limited | Au, Co, Cu, Li, Mn | 15964.5417 ha | Southern, Kazungula, Livingstone | Approved | 9th DECEMBER, 2024 |
26 | 33579-HQ-LEL | Monet Georesources Limited | Ag, AMT, AQM, Au, Co, Cu, DIA, GRF, Li, Mo, Nb, Ni, QTZ, REE, Sn, Ta, TML, W | 1074.7963 ha | Eastern, Chama | Approved | 9th DECEMBER, 2024 |
27 | 33589-HQ-LEL | Helmwa Cooperation Limited (100%) | Ag, AQM, Au, CLY, Co, Cu, Fe, FLD, GAR, Li, Ni, REE, Zn | 44246.6519 ha | Luapula, Mwense; Northern, Luwingu | Deferred | 9th DECEMBER, 2024 |
28 | 33738-HQ-LEL | RockModeller Company Limited | Ag, Au, Co, Cu, Fe, Mn, Ni, QTZ, Zn | 117.1506 ha | North Western, Solwezi | Rejected | 9th DECEMBER, 2024 |
29 | 34208-HQ-LEL | Bans Countrywide Tours Limited (100%) | Ag, Au, Bi, Cu, Fe, GRF, Li, Mn, Ni, Pb, PGM, QTZ, REE, SIL, Ta, V, Zn | 12423.5740 ha | Eastern, Chadiza | Deferred | 9th DECEMBER, 2024 |
30 | 34372-HQ-LEL | Nelna Suppliers and General Works Limited | Ag, Au, Bi, CLY, Cu, Fe, GRF, Mn, Ni, Pb, QTZ, REE, Zn | 8219.9157 ha | Central, Chibombo, Kapiri Mposhi | Deferred | 9th DECEMBER, 2024 |
31 | 34508-HQ-LEL | Eagles Holding Limited | Ag, Au, Co, Cu, Fe, Pb, Pt, Zn | 26331.7046 ha | Central, Serenje; Eastern, Katete, Nyimba, Petauke | Approved | 9th DECEMBER, 2024 |
32 | 34636-HQ-LEL | Nalume Mining Limited | Ag, Co, Cu, Fe, Zn | 67933.6908 ha | Northern, Isoka, Nakonde | Deferred | 9th DECEMBER, 2024 |
33 | 34770-HQ-LEL | Broken Hill Merchants Limited | Ag, Au, Co, Cu, Ni, Pb, Zn | 3332.9355 ha | Central, Kabwe | Deferred | 9th DECEMBER, 2024 |
34 | 35010-HQ-LEL | Dharti Mining Limited | Ag, Au, Co, Cu, Fe, Mn, Pb, REE, Ta, Zn | 2615.2104 ha | North Western, Solwezi | Deferred | 9th DECEMBER, 2024 |
35 | 35739-HQ-LEL | Tumbo Mining And Exploration Limited (100%) | Ag, Au, Co, Cu, Fe, Ni, Pb, Pt, Sn, Ti, Zn | 10703.5716 ha | Lusaka, Chongwe | approved | 9th DECEMBER, 2024 |
36 | 36833-HQ-LEL | Tianle Mineral Development Company Limited (100%) | Au, Co, Cu, Fe, Mn | 2220.9619 ha | Central, Chibombo, Kapiri Mposhi | deferred | 9th DECEMBER, 2024 |
37 | 36872-HQ-LEL | Drip Engineering and Construction Limited | Cu, Fe, Ni | 10413.0100 ha | North Western, Kasempa | deferred | 9th DECEMBER, 2024 |
38 | 36891-HQ-LEL | Daron Mining and Exploration Limited | Au, CLY, Co, Cu, DOL, Fe, GRT, Mn, Nb, P, Pb, REE, Sn, Zn | 9435.9936 ha | Central, Chibombo, Kapiri Mposhi | Deferred | 9th DECEMBER, 2024 |
39 | 36925-HQ-LEL | Musakashi Farms Limited | AMT, AQM, Au, Co, Cu, EM, Mn, QTZ, TML | 4099.8605 ha | North Western, Solwezi | Approved | 9th DECEMBER, 2024 |
40 | 37081-HQ-LEL | Mikonko Mining Limited (100%) | Ag, Au, Co, Cu, DIA, Fe, Mn | 54979.6484 ha | Northern, Chinsali | Approved | 9th DECEMBER, 2024 |
41 | 37158-HQ-LEL | Silver Pearl Motors Limited (100%) | Au, Co, Cu, DIA | 1256.5422 ha | Central, Mumbwa | Deferred | 9th DECEMBER, 2024 |
42 | 37164-HQ-LEL | SILVER JACKET GENERAL DEALERS LIMITED (100%) | Au, Cu, Fe, Mn | 110611.3300 ha | Eastern, Chipata, Lundazi | Deferred | 9th DECEMBER, 2024 |
43 | 37381-HQ-LEL | KMCI Mining Limited (100%) | Ag, Au, Co, Cu, Fe, Mn, Ni, Pb, Zn | 25628.9200 ha | Northern, Chinsali | Deferred | 9th DECEMBER, 2024 |
44 | 37545-HQ-LEL | IDWALA MINERAL RESOURCES LIMITED (100%) | Ag, AMT, Au, Co, COA, Cu, EM, Fe, Ni, Pb, QTZ, Rh, Ru, TML, Zn | 3395.9100 ha | Central, Mkushi; Eastern, Nyimba | Deferred | 9th DECEMBER, 2024 |
45 | 37598-HQ-LEL | SGC Investments Limited (100%) | Ag, am, AQM, Au, CHL, Co, Cu, EM, Fe, GAR, GRT, LST, Mn, Ni, QTZ, SIL, TML | 11777.4800 ha | Eastern, Chama | Deferred | 9th DECEMBER, 2024 |
46 | 37628-HQ-LEL | Chikaban Corporation Zambia Limited (100%) | Au, Co, Cu, Fe, Mn | 49853.0400 ha | Central, Serenje | Approved | 9th DECEMBER, 2024 |
47 | 37629-HQ-LEL | Chikaban Corporation Zambia Limited (100%) | Au, Co, Cu, Mn | 1346.1600 CU | Copperbelt, Chililabombwe, Chingola, Mufulira | Approved | 9th DECEMBER, 2024 |
48 | 37638-HQ-LEL | Zambian Metals Industries Limited (100%) | Ag, AMT, Au, Cu, Cu2CO3(OH)2, Fe, GEM1, GRT, K, LST, Ni, P, Pb, QTZ, Sand, TML, Zn | 17023.9400 ha | Eastern, Petauke | Deferred | 9th DECEMBER, 2024 |
49 | 37686-HQ-LEL | Gandi Natural Resources Company Zambia Limited (100%) | Ag, AQM, Au, CLY3, Co, Cu, FLD, GYP, MIC, Mn, Ni, QTZ, REE, TML | 12673.7300 ha | Central, Serenje | Approved | 9th DECEMBER, 2024 |
50 | 37688-HQ-LEL | P & C PRACH INVESTMENTS ZAMBIA LIMITED (100%) | Au, Co, Cu, Fe, Mn, Zn | 48014.0300 ha | North Western, Kabompo, Mufumbwe, Mwinilunga | Deferred | 9th DECEMBER, 2024 |
51 | 37696-HQ-LEL | CHADIZA MINERAL RESOURCES LIMITED (100%) | Au, Co, Cu | 24352.7900 ha | Eastern, Chadiza, Katete | Deferred | 9th DECEMBER, 2024 |
52 | 37702-HQ-LEL | damashi resources limited. (100%) | Ag, Au, Be3Al2(SiO3)6, Co, Cu, EM, Fe, LST, QTZ, Zn | 3141.2300 ha | Copperbelt, Lufwanyama; North Western, Solwezi | Approved | 9th DECEMBER, 2024 |
53 | 37714-HQ-LEL | P & C PRACH INVESTMENTS ZAMBIA LIMITED (100%) | Ag, Au, Cu, Fe, KNa2, Mn, Ni, Pb, Zn | 6349.2500 ha | Northern, Kasama, Mpika | Deferred | 9th DECEMBER, 2024 |
54 | 37718-HQ-LEL | USHA INVESTMENT LIMITED (100%) | Au, Co, Cu, EM, Pb, QTZ, REE, Zn | 3911.2100 ha | Copperbelt, Lufwanyama | Approved | 9th DECEMBER, 2024 |
55 | 37719-HQ-LEL | USHA INVESTMENT LIMITED (100%) | AMT, Cu, DIA, EM, Pb, QTZ, REE | 3454.3800 ha | Copperbelt, Lufwanyama | approved | 9th DECEMBER, 2024 |
56 | 38976-HQ-LEL | Ndola Quarries Limited (100%) | Ag, Au, Co, Cu, Cu2CO3(OH)2, Fe, Ni, Pb, Zn | 3641.6200 ha | Eastern, Petauke | Approved | 9th DECEMBER, 2024 |
57 | 37726-HQ-LEL | Gandi Natural Resources Company Zambia Limited (100%) | Ag, Au, Co, Cu, Fe, Mn, Ni, Pb, Zn | 6854.4400 ha | North Western, Kasempa, Solwezi | Deferred | 9th DECEMBER, 2024 |
58 | 37732-HQ-LEL | Eco-Rich Resources Limited (100%) | Ag, Au, Co, Cu, Zn | 8129.2500 ha | Eastern, Katete, Petauke | Approved | 9th DECEMBER, 2024 |
59 | 37734-HQ-LEL | Luban Engineering Zambia Limited (100%) | Ag, Au, Co, Cu, Cu2CO3(OH)2, DIA, Fe, Ni, Pb, Zn | 1118.0600 ha | North Western, Kasempa, Solwezi | Deferred | 9th DECEMBER, 2024 |
60 | 37744-HQ-LEL | Badiye Limited (100%) | Ag, Au, Co, Cu, Fe | 1881.6700 ha | Central, Mumbwa | Deferred | 9th DECEMBER, 2024 |
61 | 37750-HQ-LEL | jiwei mining zambia limited (100%) | Au, Co, Cu, Fe, Ni, Pb, Zn | 3515.8900 ha | North Western, Kasempa | Approved | 9th DECEMBER, 2024 |
62 | 37751-HQ-LEL | jiwei mining zambia limited (100%) | Ag, Au, Co, Cu, Cu2CO3(OH)2, Fe, KNa2, Ni, Pb, TML, Zn | 7533.8900 ha | North Western, Kasempa | Approved | 9th DECEMBER, 2024 |
63 | 37752-HQ-LEL | jiwei mining zambia limited (100%) | Au, Co, Cu, Cu2CO3(OH)2, Fe, Mn, Ni, Pb, Zn | 1147.7700 ha | Copperbelt, Masaiti | Approved | 9th DECEMBER, 2024 |
64 | 37755-HQ-LEL | Srinibash Resources Zambia Limited (100%) | Ag, Au, Co, Cu, Cu2CO3(OH)2, DIA, EM, Fe, Mn, MS, Ni, Pb, Zn | 1542.0900 ha | North Western, Solwezi | Rejected | 9th DECEMBER, 2024 |
65 | 37763-HQ-LEL | Southern African Rare Metals Mining Company Limited (100%) | Ag, Au, Co, Cu, Mn, Pb, Zn | 93733.3829 ha | Luapula, Kawambwa, Mwense | Approved | 9th DECEMBER, 2024 |
66 | 37773-HQ-LEL | Musungu Resources Limited (100%) | Ag, AMT, Au, Co, Cu, Cu2CO3(OH)2, KNa2, Mn, MS, TML | 28928.6500 ha | Northern, Chinsali, Isoka | Deferred | 9th DECEMBER, 2024 |
67 | 37779-HQ-LEL | Ngwerere General Merchants Limited (100%) | Au, Cu, Fe, Pb, Zn | 11803.4500 ha | Southern, Namwala | Deferred | 9th DECEMBER, 2024 |
68 | 37793-HQ-LEL | Sahara Mining and Resources Ltd (100%) | AMT, Au, Co, Cu, EM, Fe | 7239.8800 ha | Central, Mumbwa | Rejected | 9th DECEMBER, 2024 |
69 | 37863-HQ-LEL | jiwei mining zambia limited (100%) | Au, Co, Cu, Ni, Pb, TML | 25111.2900 ha | Lusaka, Chongwe, Kafue | deferred | 9th DECEMBER, 2024 |
70 | 37868-HQ-LEL | Dow Distributors Limited (100%) | Ag, Au, Cu, Fe, LST | 538.6500 CU | Lusaka, Chongwe | Deferred | 9th DECEMBER, 2024 |
71 | 37888-HQ-LEL | Dow Distributors Limited (100%) | Au, Cu, Fe, Gravel, LST, Zn | 20281.2300 ha | Central, Mumbwa | Deferred | 9th DECEMBER, 2024 |
72 | 37898-HQ-LEL | WEIJU INVESTMENT LIMITED (100%) | Ag, Al, Au, Bi, Co, Cu, EM, Nb, Ni, Pb, Sn, Ti, U, V, W, Zn | 35455.6000 ha | Northern, Mungwi | Approved | 9th DECEMBER, 2024 |
73 | 37918-HQ-LEL | WEIJU INVESTMENT LIMITED (100%) | Ag, Al, AMT, Au, Co, Cu, EM, Mn, Mo, Nb, Ni, Pb, REE, Sn, Ta, U, V, W, Zn | 21393.8000 ha | Eastern, Chama | Deferred | 9th DECEMBER, 2024 |
74 | 37919-HQ-LEL | Gansu Mining Company Limited (100%) | Al, Au, Bi, Co, Cu, EM, KNa2, Mn, Mo, Nb, Ni, Pb, Sn, Ti, W, Zn | 4608.7300 ha | Central, Serenje | Approved | 9th DECEMBER, 2024 |
75 | 37923-HQ-LEL | Mohafra Mining Limited (100%) | Ag, Au, Co, Cu, Cu2CO3(OH)2, DIA, Fe, K, KNa2, Li, MGS, Mn, Ni, OIL, P, Pb, PGM, Pt, PYF, PYR, RAM, | 8144.6900 ha | Eastern, Chipata | Approved | 9th DECEMBER, 2024 |
76 | 37929-HQ-LEL | Unirate Investments Limited (100%) | AMT, AQM, Au, Be3Al2(SiO3)6, Co, Cu, EM, Fe, Mn, Pb, TML, Zn | 2057.2000 ha | Central, Chibombo | Rejected | 9th DECEMBER, 2024 |
77 | 37930-HQ-LEL | Mohafra Mining Limited (100%) | Ag, AMT, Au, CC, Co, Cu, Cu2CO3(OH)2, DIA, EM, KNa2, Li, Ni, OIL, P, Pt, PYF, Sn, TML, U, Zn | 80248.0500 ha | Eastern, Lundazi | Rejected | 9th DECEMBER, 2024 |
78 | 37984-HQ-LEL | Guohua Mining Company Limited (100%) | Au, Co, Cu, KNa2, Mn, Pb, REE, Zn | 6430.7900 ha | Central, Serenje | Deferred | 9th DECEMBER, 2024 |
79 | 38073-HQ-LEL | Afrimuk Company Limited (100%) | Ag, Au, Co, Cu, Cu2CO3(OH)2, Fe, Mn, Ni, Pb, Zn | 15241.4000 ha | Western, Kaoma | Approved | 9th DECEMBER, 2024 |
80 | 38077-HQ-LEL | Primerose Resources Zambia Limited (100%) | Ag, Au, Cu, EM, Fe, MIC, Mn, Ni, Pb, QTZ, RBY, Sn, Ti, Zn | 2484.0707 ha | Southern, Sinazongwe | Deferred | 9th DECEMBER, 2024 |
81 | 38084-HQ-LEL | Fontainebleau Zambia Limited (100%) | Ag, Au, Co, Cu, Mn, Nb, Ni, Pb, Sn, Ta, W, Zn | 2993.7230 ha | Central, Serenje | Approved | 9th DECEMBER, 2024 |
82 | 38085-HQ-LEL | Srinibash Resources Zambia Limited (100%) | Ag, Au, Co, Cu, Cu2CO3(OH)2, EM, Fe, Ni, Pb, Zn | 14633.2000 ha | Copperbelt, Mpongwe | Deferred | 9th DECEMBER, 2024 |
83 | 38111-HQ-LEL | Nkana Alloy Smelting Company Limited (100%) | Au, Co, Cu, Ni | 2176.4300 ha | North Western, Mufumbwe | Deferred | 9th DECEMBER, 2024 |
84 | 38115-HQ-LEL | TECHPRO MINING LIMITED (100%) | Au, Co, Cu, DIA, Fe, Mn, Pb, QTZ, Zn | 6531.9400 ha | Central, Mumbwa; North Western, Kasempa | Approved | 9th DECEMBER, 2024 |
85 | 38125-HQ-LEL | Liuzh Company Limited (100%) | Ag, AQM, Au, Co, Cu, GAR, Mn, Nb, Pt, QTZ, TML, Zn | 18804.9200 ha | Central, Mkushi | Deferred | 9th DECEMBER, 2024 |
86 | 38129-HQ-LEL | Cibakent Lithium Technology Limited (100%) | Au, Co, Cu, Fe, Mn, Pb, QTZ | 26913.4700 ha | Northern, Mpika | Approved | 9th DECEMBER, 2024 |
87 | 38135-HQ-LEL | pumbaa ventures limited (100%) | Ag, Au, Co, Cu, Fe, Mn, Ni, Pb, Zn | 1379.9600 CU | Central, Chibombo | Deferred | 9th DECEMBER, 2024 |
88 | 38139-HQ-LEL | Israjah Enterprises Limited (100%) | Au, Cu, DIA, Fe, Mn, Pb, QTZ, Zn | 8998.1600 ha | Central, Mumbwa; North Western, Kasempa | Deferred | 9th DECEMBER, 2024 |
89 | 38155-HQ-SEL | STREET WISE MINING LIMITED (100%) | Ag, Au, Co, Cu, Fe, Ni | 33.2700 ha | North Western, Kasempa, Solwezi | Deferred | 9th DECEMBER, 2024 |
90 | 38165-HQ-LEL | Siam Mining Zambia Limited (100%) | Au, Be3Al2(SiO3)6, Co, COA, Cu, Ni, Sn, Ta | 7569.2100 ha | Southern, Namwala | Approved | 9th DECEMBER, 2024 |
91 | 38169-HQ-LEL | UNI METALS AND MINERALS LIMITED (100%) | Ag, Au, Co, Cu, GRF, GRT, Mn | 17411.5675 ha | Luapula, Mwense | DEFERRED | 9th DECEMBER, 2024 |
92 | 38172-HQ-LEL | Green Diamond Acre Agro Limited (100%) | Ag, Au, Co, Cu, Cu2CO3(OH)2, Fe, Mn, Zn | 9526.0100 ha | Northern, Kasama | Approved | 9th DECEMBER, 2024 |
93 | 38192-HQ-LEL | Solidstone Mining Limited (100%) | AQM, Au, Co, COA, Cu, LST, Pb | 1376.9763 ha | Eastern, Nyimba | Deferred | 9th DECEMBER, 2024 |
94 | 38193-HQ-LEL | Solidstone Mining Limited (100%) | Au, Cu, Fe, LST, Mn, Pb | 23178.0000 ha | Central, Mumbwa; North Western, Kasempa, Mufumbwe | Deferred | 9th DECEMBER, 2024 |
95 | 38199-HQ-LEL | Kasinta Mining Limited (100%) | AQM, CLY, COA, F, FLD | 2211.5400 ha | Southern, Gwembe | Rejection | 9th DECEMBER, 2024 |
96 | 38203-HQ-LEL | Wushuang Mining Company Limited (100%) | Ag, Au, Co, Cu, Fe, Ni, Zn | 1631.5600 ha | Southern, Itezhi Tezhi | Approved | 9th DECEMBER, 2024 |
97 | 38205-HQ-LEL | DAWOOD GEMS AND JEWELRY LIMITED (100%) | Au, Co, Cu, EM, Fe, Li, Mn, Pb | 15650.8400 ha | Northern, Mpika | Approved | 9th DECEMBER, 2024 |
98 | 38222-HQ-LEL | Willianda Investments Limited (100%) | Co, Cu, Fe, Nb | 15352.1700 ha | Northern, Chinsali | Approved | 9th DECEMBER, 2024 |
99 | 38234-HQ-LEL | Luban Engineering Zambia Limited (100%) | Ag, AQM, Au, Cu, Mn, QTZ | 6705.7500 ha | Eastern, Lundazi | Approved | 9th DECEMBER, 2024 |
100 | 38262-HQ-LEL | Ishmu Mining Company Limited | Ag, Au, Co, Cu, Cu2CO3(OH)2, Fe, Ni, Pb, Zn | 5940.4000 ha | North Western, Solwezi | approved | 9th DECEMBER, 2024 |
101 | 38269-HQ-LEL | Fontainebleau Zambia Limited (100%) | Au, Co, Cu, Fe, Ni, QTZ, Zn | 18688.2409 ha | Central, Mkushi | Approved | 9th DECEMBER, 2024 |
102 | 38297-HQ-LEL | Madi Resources Limited (100%) | Ag, Au, Cu, Fe, Mn, Ni, Pb, QTZ, Ta, Zn | 12280.8900 ha | Northern, Chinsali | Approved | 9th DECEMBER, 2024 |
103 | 38326-HQ-LEL | Larrys Lorrys Limited (100%) | Au, Co, Cu, Fe, LST, Pb | 3448.2800 ha | North Western, Solwezi | Approved | 9th DECEMBER, 2024 |
104 | 38365-HQ-LEL | Fontainebleau Zambia Limited (100%) | Au, COA, Cu, Fe, Mn, Ni, Pb, QTZ, Zn | 5370.9700 ha | Central, Mkushi | approved | 9th DECEMBER, 2024 |
106 | 38446-HQ-LEL | NTUBU MINERALS LIMITED (100%) | Ag, AMT, Au, Co, Cu, Cu2CO3(OH)2, EM, Mn, Ni, Pb, TML, Zn | 5026.4600 ha | North Western, Mufumbwe | Approved | 9th DECEMBER, 2024 |
107 | 38450-HQ-LEL | Gandi Natural Resources Company Zambia Limited (100%) | Ag, AMT, Au, COA, Cu, Cu2CO3(OH)2, DOL, F, Fe, FLD, GAR, Li, MIC, QTZ, SIL, Sn, Ta | 1218.2500 ha | Southern, Siavonga | Approved | 9th DECEMBER, 2024 |
108 | 38455-HQ-LEL | Zamqlik Logistics Limited (100%) | Au, Co, Cu, Fe, Ni | 4103.1700 ha | Copperbelt, Luanshya, Masaiti | Deferred | 9th DECEMBER, 2024 |
109 | 38464-HQ-LEL | Sherco investment limited (100%) | Ag, Au, Co, Cu, Cu2CO3(OH)2, Pb, Zn | 3651.4800 ha | Lusaka, Chongwe | Deferred | 9th DECEMBER, 2024 |
110 | 38484-HQ-LEL | Salman mining Enterprises Limited (100%) | AQM, Au, Co, Cu, Fe, GEM, LST, Mn, Pb, QTZ, Sand, SiO2, TML, Zn | 65632.4500 ha | Eastern, Chama, Lundazi | Rejected | 9th DECEMBER, 2024 |
111 | 38489-HQ-LEL | Mboo Investments Limited (100%) | COA, Ni, Sn, Ta | 3211.4300 ha | Southern, Sinazongwe | Rejected | 9th DECEMBER, 2024 |
112 | 38494-HQ-LEL | Iimba Enterprises Limited (100%) | Au, Co, Cu, Fe, Mn, Ni, Pb, QTZ, Zn | 3636.6400 ha | Central, Kapiri Mposhi, Mkushi | Approved | 9th DECEMBER, 2024 |
113 | 38500-HQ-LEL | Neptune Iron Ore Mining LTD (100%) | Au, Cu, Fe, Mn, Ni, Sn, Ta, W, Zn | 30310.9821 ha | Central, Serenje | approved | 9th DECEMBER, 2024 |
114 | 38501-HQ-LEL | BUTTERFLY COPPER MINING LIMITED (100%) | Ag, Au, Co, Cu, DIA, EM, KNa2, Mn, Ni, TML, Zn | 11756.0100 ha | Luapula, Mansa, Milenge | Approved | 9th DECEMBER, 2024 |
115 | 38504-HQ-LEL | Musokamuka Kasempa Mining and Construction Limited (100%) | Au, Cu | 3555.3400 ha | North Western, Kasempa | Approved | 9th DECEMBER, 2024 |
116 | 38510-HQ-LEL | ECO HARVEST EXPLORATION LIMITED (100%) | Au, Co, COA, Cu | 7008.5800 ha | Southern, Gwembe | Approved | 9th DECEMBER, 2024 |
117 | 38511-HQ-LEL | Kameha Resources Limited (100%) | Ag, AMT, Au, Co, COA, Cu, EM, F, Fe, FLD, Gravel, LST, Mn, Pb, Sand, Zn | 6403.5000 ha | Southern, Gwembe, Siavonga | Rejected | 9th DECEMBER, 2024 |
118 | 38515-HQ-LEL | Zuri Mineral Resources Limited (100%) | Ag, Au, Co, Cu, Fe, Ni, Zn | 3748.6900 ha | Central, Chibombo | Approved | 9th DECEMBER, 2024 |
119 | 38530-HQ-LEL | Jewel of Africa Limited (100%) | Ag, Au, CAR, Co, Cu, DIA, EM, Fe, GEM1, KNa2, Mn, Ni, Pb, SIL, SO4, SUL, Ti, TML, Zn | 7033.6300 ha | Central, Mumbwa | Deferred | 9th DECEMBER, 2024 |
120 | 38547-HQ-LEL | Leonk mining consultants Limited (100%) | Ag, Al, Au, CAR, Co, COA, Cu, DIA, EM, Fe, KNa2, Mn, SIL, SO4, SUL, Ti, TML, Zn | 135241.8800 ha | Central, Mumbwa; Southern, Itezhi Tezhi | Approved | 9th DECEMBER, 2024 |
121 | 38570-HQ-LEL | Lafoye Company Limited (100%) | Ag, Au, Co, Cu, Cu2CO3(OH)2, DIA, Fe, LST, Ni, Pb, Zn | 5382.2222 ha | North Western, Mwinilunga | deferred | 9th DECEMBER, 2024 |
122 | 38573-HQ-LEL | Musia Minerals Limited (100%) | Ag, Au, Co, Cu, EM, Fe, GAR, LST, Mn, TML | 24419.7100 ha | Southern, Kazungula, Livingstone | Approved | 9th DECEMBER, 2024 |
123 | 38589-HQ-LEL | Tianle Mineral Development Company Limited | AMT, Au, Be3Al2(SiO3)6, Cu, DOL, EM, Fe, GAR, Gravel, LST, MBL, MIC, Mn, QTZ, Sand | 2051.9300 ha | Eastern, Petauke | Approved | 9th DECEMBER, 2024 |
124 | 38595-HQ-LEL | SHihong Minerals Limited (100%) | Ag, Au, Co, Cu, Fe, LST, Mn, Ni, Zn | 3501.7800 ha | North Western, Mwinilunga | Approved | 9th DECEMBER, 2024 |
125 | 38621-HQ-LEL | Orein Resources Limited (100%) | Au, Co, Cu, Fe, Ni, Zn | 7473.1000 ha | Central, Chibombo | approved | 9th DECEMBER, 2024 |
126 | 38637-HQ-LEL | LIHAAN MINING COMPANY LIMITED (100%) | Ag, AQM, Au, Co, Cu, GRF, Mn, Ni, Pb, Sn | 8979.5500 ha | Northern, Mungwi | Approved | 9th DECEMBER, 2024 |
127 | 38641-HQ-LEL | LIHAAN MINING COMPANY LIMITED (100%) | Ag, AQM, Au, Co, Cu, GRF, Mn, Ni, Pb, Sn | 11439.6800 CU | Northern, Mbala, Mporokoso, Mungwi | Approved | 9th DECEMBER, 2024 |
128 | 38666-HQ-LEL | ELEGANTE MINERAL RESOURCES LIMITED (100%) | Au, Co, Cu, Ni, Pb, QTZ, Zn | 2412.2378 ha | North Western, Solwezi | Approved | 9th DECEMBER, 2024 |
129 | 38682-HQ-LEL | BRAJOC MINERALS RESOURCES SUPPLY LIMITED (100%) | Au, Co, Cu, Fe, Ni, Zn | 9813.3179 ha | North Western, Kasempa | Approved | 9th DECEMBER, 2024 |
130 | 38687-HQ-LEL | Strong Tower Mining Ltd (100%) | Au, COA, Cu, Fe, Ni, Zn | 27106.7203 ha | Eastern, Lundazi | Approved | 9th DECEMBER, 2024 |
131 | 38688-HQ-LEL | MODIBO RESOURCES LIMITED (100%) | Bi, CC, CHL, CLY3, COA, F, GAR, GRF, GRT, GYP, KYN, MIC, Mo, NACO, Pd, Rb, REE, Rh, TLC, V, W | 2359.3900 ha | Southern, Gwembe | Approved | 9th DECEMBER, 2024 |
132 | 38692-HQ-LEL | BRAJOC MINERALS RESOURCES SUPPLY LIMITED (100%) | Au, Cu, Zn | 1397.2200 ha | North Western, Mwinilunga | Approved | 9th DECEMBER, 2024 |
133 | 38695-HQ-LEL | Multiport Logistics Limited (100%) | COA | 2691.8100 CU | Southern, Gwembe | Approved | 9th DECEMBER, 2024 |
134 | 38697-HQ-LEL | DIEN MINING COMPANY LIMITED (100%) | Au, Co, Cu, QTZ, Zn | 14607.2000 ha | North Western, Kasempa | Approved | 9th DECEMBER, 2024 |
135 | 38716-HQ-LEL | Premiere Consolidated Mining Limited (100%) | Ag, Au, Co, Cu, Ni, Pt, QTZ, U, Zn | 4034.7900 ha | North Western, Solwezi | Approved | 9th DECEMBER, 2024 |
136 | 38719-HQ-LEL | Mabwetuba Investments Limited (100%) | Au, Co, Cu, KNa2, Mn, Ni | 2183.0000 ha | North Western, Kabompo | Approved | 9th DECEMBER, 2024 |
137 | 38746-HQ-LEL | Nyami Resources Limited (100%) | Ag, Au, Co, Cu, Fe, Mn, Ni, Pb, REE, Zn | 8651.4200 ha | North Western, Kasempa | Approved | 9th DECEMBER, 2024 |
138 | 38750-HQ-LEL | Jingdao Mining Limited (100%) | Ag, Au, Co, COA, DIA, EM, Fe, Mn, Ni, Pb, TML, Zn | 19289.2300 ha | Northern, Isoka | Approved | 9th DECEMBER, 2024 |
139 | 38763-HQ-LEL | Buccha Minerals Quest Limited (100%) | Ag, Au, Co, Cu, Fe, Mn, Ni, Pb, Zn | 22762.5200 ha | North Western, Mwinilunga, Solwezi | approved | 9th DECEMBER, 2024 |
140 | 38771-HQ-LEL | ZIQUAN MINING LIMITED (100%) | Ag, AMT, Au, Co, Cu, Fe, MIC, Mn, Ni, Pb, QTZ, Zn | 145369.8408 ha | Luapula, Nchelenge; Northern, Kaputa | Approved | 9th DECEMBER, 2024 |
141 | 38794-HQ-LEL | Wushuang Mining Company Limited (100%) | Ag, Au, Be3Al2(SiO3)6, Co, Cu, Ni | 6058.0300 ha | Copperbelt, Masaiti | Approved | 9th DECEMBER, 2024 |
142 | 38800-HQ-LEL | Hanfu Mining Company Limited (100%) | Ag, Au, Be3Al2(SiO3)6, Co, Cu | 3390.4684 ha | Copperbelt, Luanshya, Masaiti | Approved | 9th DECEMBER, 2024 |
143 | 38833-HQ-LEL | Jingdao Mining Limited (100%) | Ag, Au, Co, COA, Cu, REE | 11872.1400 ha | Eastern, Chama | Approved | 9th DECEMBER, 2024 |
144 | 38837-HQ-LEL | Jingdao Mining Limited (100%) | Al, AMT, COA, Cu, DOL, EM, F, Fe, FLD, GRF, GRT, He, Hg, KNa2, Li, MIC, MIC3, Mn, QTZ, REE, Rh, SIL, | 2852.2900 ha | Southern, Siavonga | Approved | 9th DECEMBER, 2024 |
145 | 38866-HQ-LEL | Blue Fox Metals Limited (100%) | FLD, MIC | 5611.8300 ha | Southern, Mazabuka | Approved | 9th DECEMBER, 2024 |
146 | 38867-HQ-LEL | Kumbele Mining Company Limited (100%) | Ag, Au, Co, COA, Cu, Fe, LST, Mn, SIL, Zn | 17389.5700 ha | Copperbelt, Chililabombwe, Chingola, Kalulushi | Approved | 9th DECEMBER, 2024 |
147 | 38868-HQ-LEL | Zambian Anglo Copper Limited (100%) | Ag, Au, Co, Cu, Fe | 2344.7600 ha | North Western, Mwinilunga | Approved | 9th DECEMBER, 2024 |
148 | 38870-HQ-LEL | Zambian Anglo Copper Limited (100%) | Ag, Au, Co, Cu, EM | 5419.2300 ha | North Western, Solwezi | Approved | 9th DECEMBER, 2024 |
149 | 38878-HQ-LEL | VANBUROCK RESOURCES LIMITED (100%) | Au, Co, Cu, Fe, Ni | 19351.2410 ha | North Western, Kasempa | Approved | 9th DECEMBER, 2024 |
150 | 38880-HQ-LEL | Afrique Nama Mining Limited (100%) | Au, Co, Cu, Fe, Ni | 5804.1492 ha | North Western, Mwinilunga | Approved | 9th DECEMBER, 2024 |
151 | 38881-HQ-LEL | Shoe Bill Resources Limited (100%) | Co, Cu, Cu2CO3(OH)2, Fe, Ni | 16380.9000 ha | North Western, Mwinilunga | Approved | 9th DECEMBER, 2024 |
152 | 38896-HQ-LEL | Fontainebleau Zambia Limited (100%) | Au, COA, Cu, Mn, Ni, Pb, Ta, W, Zn | 7624.9094 ha | Lusaka, Chongwe | Approved | 9th DECEMBER, 2024 |
153 | 38897-HQ-LEL | Chitubula Investments Limited (100%) | AMT, Au, Co, Cu, Cu2CO3(OH)2, EM, F, Fe, GEM, GYP, KNa2, Li, Mn, Ni, Pb, PGM, QTZ, REE, Zn | 7359.4200 ha | Central, Mkushi | Approved | 9th DECEMBER, 2024 |
154 | 38898-HQ-LEL | Guoli Energy Zambia Limited (100%) | Al, Co, COA, Cu, F, Mn, Sn | 1474.4858 ha | Southern, Gwembe | Approved | 9th DECEMBER, 2024 |
155 | 38907-HQ-LEL | Digital African Company Limited (100%) | Au, Co, Cu, Fe, Mn, Pb, QTZ, Zn | 24899.5500 ha | North Western, Mufumbwe | Approved | 9th DECEMBER, 2024 |
156 | 38916-HQ-LEL | Green Mineral Zambia Limited (100%) | Ag, Au, Co, Cu, Fe | 1692.6200 ha | North Western, Solwezi | Approved | 9th DECEMBER, 2024 |
157 | 38918-HQ-LEL | Golden Flame International Company Limited (100%) | Au, Co, COA, Cu, Mn | 5606.6370 ha | North Western, Kasempa | Approved | 9th DECEMBER, 2024 |
158 | 38919-HQ-LEL | Green Mineral Zambia Limited (100%) | Ag, Au, Co, Cu, Fe | 1300.5200 ha | North Western, Solwezi | Rejected | 9th DECEMBER, 2024 |
159 | 38921-HQ-LEL | Momentum Mining Services Limited (100%) | Ag, Au, Co, Cu, Fe, Mn, Ni, Pb, QTZ, Zn | 2165.8800 ha | Copperbelt, Mpongwe | Approved | 9th DECEMBER, 2024 |
160 | 38926-HQ-LEL | Goldenfly Investment Zambia Limited (100%) | Ag, Au, Co, COA, Cu, LST, Ni, QTZ, Zn | 3424.1201 ha | Southern, Sinazongwe | Approved | 9th DECEMBER, 2024 |
161 | 38930-HQ-LEL | Deacons Mines Limited (100%) | Au, Co, Cu, Cu2CO3(OH)2, Fe, LST, Ni, Zn | 2662.0900 ha | Central, Mumbwa; North Western, Kasempa | Approved | 9th DECEMBER, 2024 |
162 | 38932-HQ-LEL | Grownyz Zambia Limited (100%) | COA, Cu, GRT, LST, Mn, Sn, Zn | 6796.6625 ha | Southern, Sinazongwe | Approved | 9th DECEMBER, 2024 |
163 | 38934-HQ-LEL | Winzan Mining Limited (100%) | Ag, As, Au, Co, Cu, Fe, GRF, LST, Mn, Pb, Pt, Zn | 81599.4713 ha | Copperbelt, Chililabombwe, Chingola, Lufwanyama | Deferred | 9th DECEMBER, 2024 |
164 | 38935-HQ-LEL | HONG YUN MINING COMPANY LIMITED (100%) | AMT, AQM, Au, Be3Al2(SiO3)6, COA, Cu, Fe, FLD, GAR, Li, Mn | 22413.4400 ha | North Western, Kasempa | Approved | 9th DECEMBER, 2024 |
165 | 38945-HQ-SEL | ELEGANTE MINERAL RESOURCES LIMITED (100%) | Au, Co, Cu, Fe, Zn | 525.2612 ha | North Western, Solwezi | approved | 9th DECEMBER, 2024 |
166 | 38946-HQ-LEL | DONZAM EXPLORATION & MINING ZAMBIA LIMITED | Ag, Au, CAR, Co, Cu, Cu2CO3(OH)2, DIA, Fe, Ni, Pb, QTZ, REE, Zn | 2427.4200 ha | Central, Mumbwa | Approved | 9th DECEMBER, 2024 |
167 | 38949-HQ-LEL | DONZAM EXPLORATION & MINING ZAMBIA LIMITED | Ag, Au, COA, Cu, Fe, Ni, Pb, Zn | 11328.7600 ha | Lusaka, Chongwe | Approved | 9th DECEMBER, 2024 |
168 | 38956-HQ-LEL | DIEN MINING COMPANY LIMITED (100%) | Ag, Au, Co, Cu, Fe, LST, Pb, Zn | 25111.2900 ha | Lusaka, Chongwe, Kafue | Approved | 9th DECEMBER, 2024 |
169 | 38981-HQ-LEL | Uluse Minerals Limited (100%) | Au, Co, Cu, Fe, Zn | 1627.7000 ha | Southern, Siavonga | Approved | 9th DECEMBER, 2024 |
170 | 38982-HQ-LEL | Horizon Freight Serices Limited (100%) | Ag, Au, Co, Cu, Fe, Mn, Ni, Pb, Zn | 4323.3500 ha | Northern, Mpika | approved | 9th DECEMBER, 2024 |
171 | 38983-HQ-LEL | Gracious Green Farm Linted (100%) | Ag, Au, Co, Cu, Cu2CO3(OH)2, Fe, Gravel, Hg, LST, Mn, Ni, Pb, Zn | 1233.3600 ha | North Western, Mwinilunga | Approved | 9th DECEMBER, 2024 |
172 | 39001-HQ-LEL | Solid Connections Zambia Limited | Ag, Au, Co, Cu, Fe, Mn, Ni, Pb, QTZ, Zn | 11847.4100 ha | Central, Mkushi, Serenje | Approved | 9th DECEMBER, 2024 |
173 | 39006-HQ-LEL | Bandar Investments Limited (100%) | Au, Co, Cu, Fe, FLD, MIC, Ni, QTZ, Zn | 3853.5700 ha | Northern, Mpika | Approved | 9th DECEMBER, 2024 |
174 | 39009-HQ-LEL | Edenvale Investments Limited | Ag, AQM, Au, Co, Cu, Cu2CO3(OH)2, F, GYP, Mn, QTZ, Zn | 6192.7010 ha | North Western, Mwinilunga | Approved | 9th DECEMBER, 2024 |
175 | 39019-HQ-LEL | Horizon Freight Serices Limited (100%) | Ag, Au, Co, Cu, Fe, Mn, Ni, Pb, Zn | 13226.8300 ha | Northern, Mbala, Mungwi | Approved | 9th DECEMBER, 2024 |
176 | 37494-HQ-LEL | Ulubwe Mining Limited | Ag, Au, Co, Cu, Fe, Mn, Ni, Pb, Zn | 5087.77 ha | Central, Chibombo | Approved | 9th DECEMBER, 2024 |
177 | 38889-HQ-LEL | Jingdao Mining Limited (100%) | Co, Cu, EM, Fe, Mn, Pb, TML, Zn | 28246.3900 ha | Eastern , Chama | Approved | 9th DECEMBER, 2024 |
178 | 38892-HQ-LEL | Jingdao Mining Limited (100%) | Co, Cu, EM, Fe, Mn, Pb, TML, Zn | 1605.97 ha | Siavonga, Southern | Approved | 9th DECEMBER, 2024 |
179 | 38937-HQ-LEL | Golden Gridlines Solutions Limited | Ag, Au, Co, Cu, Fe,Pb, Zn | 9070.99 ha | Luapula | Approved | 9th DECEMBER, 2024 |
180 | 38629-HQ-LEL | Golden Gridlines Solutions Limited | Ag, Au, Co, Cu, Fe,Pb, Zn | 3759.24 ha | Luapula, Mansa, Milenge | Approved | 9th DECEMBER, 2024 |
181 | 38890-HQ-LEL | Golden Gridlines Solutions Limited | Ag, Au, Co, Cu, Fe,Pb, Zn | 85418.8600 ha | Eastern, Chama, Northern, Mpika | Approved | 9th DECEMBER, 2024 |
182 | 38938-HQ-LEL | Jingneng Mining Limited | Ag, Au, Co, Cu, Fe,Pb, Zn | 24400 ha | North western, Mufumbwe | Approved | 9th DECEMBER, 2024 |
183 | 38939-HQ-LEL | Jingneng Mining Limited | Ag, Au, Co, Cu, Fe,Pb, Zn | 97586 ha | North western, Kasempa | Deferred | 9th DECEMBER, 2024 |
184 | 38940-HQ-LEL | Jingneng Mining Limited | Ag, Au, Co, Cu, Fe,Pb, Zn | 33211.83 ha | Central, Mumbwa, North western, Kasempa | Approved | 9th DECEMBER, 2024 |
185 | 38936-HQ-LEL | ZIQUAN MINING LIMITED (100%) | Ag, Au, Co, Cu, Fe,Pb, Zn | 2163.2600 ha | Southern, Monze | Approved | 9th DECEMBER, 2024 |
186 | 38891-HQ-LEL | ZIQUAN MINING LIMITED (100%) | Ag, Au, Co, Cu, Fe,Pb, Zn | 74101.8900 ha | Eastern, Chama | Approved | 9th DECEMBER, 2024 |
187 | 38933-HQ-LEL | Grownyz Zambia Limited (100%) | Ag, Au, Co, Cu, Fe,Pb, Zn | 116829.28 ha | Mungwi, Mbala, Northern | Approved | 9th DECEMBER, 2024 |
188 | 38812-HQ-SEL | FIERCE DRAGON INVESTMENT LIMITED (100%) | Sn, Ta, TML, W | 156.3600 ha | Southern, Kalomo | Approved | 9th DECEMBER, 2024 |
190 | 38876-HQ-SEL | Misoler Investment Limited (100%) | Ag, Au, Cu, Mn, Pb, Zn | 155.4000 CU | North Western, Mufumbwe | Approved | 9th DECEMBER, 2024 |
191 | 36726-HQ-LEL | Lobo General dealers | Ag, Au, Co, Cu, Fe,Pb, Zn | 2621.9829 ha | Central, Serenje | Approved | 9th DECEMBER, 2024 |
192 | 25753-HQ-LEL | Interprochan Enterprises Limited | Ag, Au, Co, Cu, Fe,Pb, Zn | 106237.0569 ha | North Western, Solwezi | Approved | 9th DECEMBER, 2024 |
193 | 38802-HQLEL | Mount Putuo Copper Mine Limited | Ag, Au, Co, Cu, Fe,Pb, Zn | 7880.5200 ha | Eastern, Nyimba; Lusaka, Chongwe, Luangwa | Approved | 9th DECEMBER, 2024 |
194 | 38804-HQ-LEL | Mount Putuo Copper Mine Limited | Ag, Au, Co, Cu, Fe,Pb, Zn | 29349.3900 ha | Lusaka, Luangwa | Approved | 9th DECEMBER, 2024 |
195 | 38806-HQ-LEL | Mount Putuo Copper Mine Limited | Ag, Au, Co, Cu, Fe,Pb, Zn | 4406.9800 ha | Central, Mumbwa | Approved | 9th DECEMBER, 2024 |
196 | 38851-HQ-LEL | CORE LODE INVESTMENTS LIMITED | Ag, Au, Co, Cu, Fe,Pb, Zn | 10027.9500 ha | Eastern, Lundazi | Approved | 9th DECEMBER, 2024 |
197 | 38849-HQ-LEL | CORE LODE INVESTMENTS LIMITED | Ag, Au, Co, Cu, Fe,Pb, Zn | 14329.6700 ha | Central, Mumbwa | Approved | 9th DECEMBER, 2024 |
198 | 37969-HQ-LEL | Zanima Natural Resources Limited | Ag, Au, Co, Cu, Fe,Pb, Zn | 80058.3700 ha | Eastern, Lundazi, Mambwe; Northern, Mpika | Approved | 9th DECEMBER, 2024 |
199 | 37951-HQ-LEL | Zanima Natural Resources Limited | Ag, Au, Co, Cu, Fe,Pb, Zn | 1830.5600 ha | Eastern, Mambwe | Approved | 9th DECEMBER, 2024 |
200 | 38435-HQ-LEL | BUTTERFLY COPPER MINING LIMITED | Ag, Au, Co, Cu, Fe,Pb, Zn | 23927.4600 ha | Eastern, Chipata, Katete | Approved | 9th DECEMBER, 2024 |
201 | 38407-HQ-LEL | BUTTERFLY COPPER MINING LIMITED | Ag, Au, Co, Cu, Fe,Pb, Zn | 0496.1500 ha | Central, Mumbwa; North Western, Kasempa, Mufumbwe | Approved | 9th DECEMBER, 2024 |
202 | 38762-HQ-LEL | Buccha Minerals Quest Limited | Ag, Au, Co, Cu, Fe,Pb, Zn | 5192.6800 ha | North Western, Solwezi | Approved | 9th DECEMBER, 2024 |
203 | 38761-HQ-LEL | Buccha Minerals Quest Limited | Ag, Au, Co, Cu, Fe,Pb, Zn | 27662.6900 ha | North Western, Kabompo | Approved | 9th DECEMBER, 2024 |
SMALL SCALE EXPLORATION LICENCE APPLICATIONS | WINDOW PERIOD | ||||||
S/N | PARTIES | COMMODITIES | AREA | MAP REFERENCE | MLC DECISION | CODE | |
1 | 20541-HQ-SEL | Afro Dynamics Limited | Au, Cu, GYP, LWA | 320.7450 ha | Northern, Mpika | Approved | 9th DECEMBER, 2024 |
2 | 24398-HQ-SEL | Sulita Investments Limited (100%) | Ag, Au, Be3Al2(SiO3)6, Co, COA, Cu, Mn, QTZ, Sn, Ti, U, Zn | 439.0578 ha | North Western, Kasempa | Deferred | 9th DECEMBER, 2024 |
3 | 28375-HQ-SEL | Uni-African Mining and Energy Corporation Limited | Au, Co, Cu, Fe, Pb, Zn | 198.0576 ha | Lusaka, Chongwe | Approved | 9th DECEMBER, 2024 |
4 | 28393-HQ-SEL | Wanxiang Resources Limited | Au, Cu, Mg, Mn, Zn | 424.2588 ha | Central, Mkushi | Approved | 9th DECEMBER, 2024 |
5 | 30498-HQ-SEL | Millenium Business systems Ltd (100%) | AMT, AQM, QTZ | 35.5255 ha | Southern, Sinazongwe | Deferred | 9th DECEMBER, 2024 |
6 | 30627-HQ-SEL | Konige Mining and Exploration Limited | Ag, AMT, Au, Co, COA, Cu, Ni, Sn | 321.9308 ha | Southern, Kalomo | Rejected | 9th DECEMBER, 2024 |
7 | 31284-HQ-SEL | Lulea Mining Engineering Limited | CLY, CLY3, DOL, FLD, GRT, LST, SDG, SIL | 854.5725 ha | Central, Chibombo; Lusaka, Kafue | Approved | 9th DECEMBER, 2024 |
8 | 32568-HQ-AMR | Katangwa Mushinge (100%) | Ag, Au, Fe, QTZ | 6.6005 ha | Central, Mumbwa | Approved | 9th DECEMBER, 2024 |
9 | 32569-HQ-SEL | Aarey Mining Limited | Be3Al2(SiO3)6, Bi, CAR, Co, Cu, EM, QTZ, REE, TLC | 558.7556 ha | Northern, Mpika | Approved | 9th DECEMBER, 2024 |
10 | 32758-HQ-SEL | JDT Logistics Limited | Au, GEM | 519.3869 ha | Central, Mkushi | Deferred | 9th DECEMBER, 2024 |
11 | 32781-HQ-SEL | Duonel Agencies Limited | AMT, AQM, Au, Co, Cu, EM, GRF, Li, Mo, Ni, REE, Ta, TML | 29.9795 ha | Copperbelt, Luanshya, Lufwanyama | Deferred | 9th DECEMBER, 2024 |
12 | 32867-HQ-SEL | Lakki Reddy Mining Limited | Au, Co, Cu, Fe, Mn, Pb, Zn | 999.7460 ha | Deferred | 9th DECEMBER, 2024 | |
13 | 33000-HQ-SEL | Verona Investments Limited | CLY, CLY3, FLD, LST, SAM, TLC | 959.6028 ha | Lusaka, Chongwe, Kafue | Deferred | 9th DECEMBER, 2024 |
14 | 33101-HQ-SEL | Mon Fuel and Oil Investment | Au, Co, Cu, LST, Mn, QTZ, Zn | 266.7435 ha | Copperbelt, Masaiti | Deferred | 9th DECEMBER, 2024 |
15 | 33149-HQ-SEL | Simuka Enterprises Limited (100%) | AMT, Au, Be3Al2(SiO3)6, Co, COA, Cu, Fe, Li, Mn, Ni, REE, Sn, Ta, W | 32.5667 ha | Southern, Sinazongwe | Deferred | 9th DECEMBER, 2024 |
16 | 33248-HQ-SEL | Avocado Mining Limited | Al, Au, Be3Al2(SiO3)6, Co, Cu, Fe, Li, Mn, REE, Sn, Ta, W | 209.0842 ha | Southern, Kalomo | Deferred | 9th DECEMBER, 2024 |
17 | 33477-HQ-SEL | Hakoda Resources Limited | Au, Co, Cu | 382.1627 ha | North Western, Mwinilunga | Deferred | 9th DECEMBER, 2024 |
18 | 33548-HQ-SEL | Drive Pack Company Limited (100%) | Ag, Au, Bi, Cu, Fe, GRF, Li, Mn, Ni, Pb, PGM, QTZ, REE, Ta, V, Zn | 964.8166 ha | Luapula, Mansa | Deferred | 9th DECEMBER, 2024 |
19 | 33567-HQ-SEL | Nantube Investment Limited (100%) | Au, LST, P, QTZ | 650.6268 ha | Copperbelt, Lufwanyama | Deferred | 9th DECEMBER, 2024 |
20 | 33593-HQ-SEL | Trifecta Minerals Zambia Limited | Co, Cu, Fe, Mn | 625.7725 ha | North Western, Solwezi | Deferred | 9th DECEMBER, 2024 |
21 | 33598-HQ-LEL | Buleya Mining Zambia Limited | Ag, Au, Co, Cu, EM, Mn, Ni, Pb, Pt, REE | 58185.8011 ha | Luapula, Mansa, Mwense; Northern, Luwingu | Approved | 9th DECEMBER, 2024 |
22 | 34211-HQ-SEL | MJK Resources Zambia Limited (100%) | Au, Co, Cu, Mn, Zn | 13.4373 ha | Luapula, Mansa | Deferred | 9th DECEMBER, 2024 |
23 | 34234-HQ-SEL | Mining and Business Alliance Limited (100%) | AMT, AQM, Au, Cu, GAR, GRT, Li, MIC, QTZ, SIL, Sn, STN2, Ta, TML | 180.0170 ha | Deferred | 9th DECEMBER, 2024 | |
24 | 34253-HQ-SEL | Bay Waters Company Limited | Cu, GEM, Mn | 119.8884 CU | North Western, Solwezi | Deferred | 9th DECEMBER, 2024 |
25 | 34334-HQ-SEL | Folklands Mining Limited | Ag, Au, Co, Cu, Ni | 972.0443 ha | Central, Chibombo | Deferred | 9th DECEMBER, 2024 |
26 | 34635-HQ-SEL | Lawanta Investment Limited | Au, Co, Cu, GRT, Ni, Pb, QTZ, SIL, Ti, Zn | 106.8849 ha | North Western, Solwezi | Deferred | 9th DECEMBER, 2024 |
27 | 34769-HQ-SEL | Union Star Exploration Zambia Limited | AMT, Cu, Pb, Sn | 322.9920 ha | Southern, Kalomo | Deferred | 9th DECEMBER, 2024 |
28 | 34811-HQ-SEL | Qomolangma Resources Limited | Co, Cu, Mn, MS, Pb, Sn | 132.3778 ha | Central, Mumbwa | Deferred | 9th DECEMBER, 2024 |
29 | 35072-HQ-SEL | Luamba Investment Company Limited | Ag, Co, Cu, Mn, Pb, Zn | 722.5637 ha | Central, Mkushi | Deferred | 9th DECEMBER, 2024 |
30 | 35267-HQ-SEL | Kabijiba Mining Company Limited | Au, Co, Cu, LST, Mn, Pb, Zn | 520.7758 ha | North Western, Solwezi | Approved | 9th DECEMBER, 2024 |
31 | 36117-HQ-SEL | Mwalkan Investments Limited | Ag, Au, Co, Cu, Fe, Mn, Pb, Zn | 161.6185 ha | Lusaka, Chongwe | Approved | 9th DECEMBER, 2024 |
32 | 36140-HQ-SEL | Pansuma Group Limited | Au, Bi, Cu, DOL, Fe, FLD, Gravel, GRT, LST, MBL, QTZ, STN | 59.4476 ha | Lusaka, Chongwe | Deferred | 9th DECEMBER, 2024 |
33 | 36354-HQ-SEL | Crustern Investments Limited (100%) | Ag, Au, Co, Cu, Fe, Ni, Sn, Ta, Zn | 464.3623 ha | Western, Kaoma | Deferred | 9th DECEMBER, 2024 |
34 | 36431-HQ-SEL | Kutumia Resources Limited | Ag, AMT, Au, Co, Cu, GRF, GRT, GYP, Li, LST, Mn, Nb, Pb, Pt, QTZ, REE, SIL, SiO2, TML, Zn, Zr | 460.7451 ha | Central, Serenje | Deferred | 9th DECEMBER, 2024 |
35 | 36485-HQ-SEL | Samre Mining Resources Limited (100%) | Au, Co, Cu | 863.8343 ha | Central, Mkushi | Deferred | 9th DECEMBER, 2024 |
36 | 36546-HQ-SEL | Cost Harvest Llimited | Al, Au, Co, COA, Cu, Fe, Mn, Pb, SIL, Zn | 60.3330 ha | North Western, Mwinilunga | Deferred | 9th DECEMBER, 2024 |
37 | 36548-HQ-SEL | Evident Mining Solutions Limited | Au, Co, COA, Cu, Fe, Mn, Pb, SIL, Zn | 79.6226 ha | Central, Kapiri Mposhi | Deferred | 9th DECEMBER, 2024 |
38 | 36667-HQ-SEL | Katonje Minerals Limited (100%) | Al, Au, Co, Cu, F, GYP, Mn, Ni, Pb, Sn, Zn | 98.5042 ha | Southern, Siavonga | Deferred | 9th DECEMBER, 2024 |
39 | 36689-HQ-SEL | Grand Prosperous Company Limited | GYP, TLC, W | 101.8480 ha | Southern, Siavonga | Deferred | 9th DECEMBER, 2024 |
40 | 36722-HQ-SEL | Camsun Mining Limited | AMT, AQM, Au, Be3Al2(SiO3)6, Cu, Li, REE, Sn | 319.6616 ha | Southern, Kalomo | Deferred | 9th DECEMBER, 2024 |
41 | 36754-HQ-SEL | Salmar Zambia Limited | Au, Co, Cu, DIA, DOL, EM, Fe, GAR, LST, Mn, Pb, Sn, TML, Zn | 797.2264 ha | North Western, Kasempa | Deferred | 9th DECEMBER, 2024 |
42 | 36764-HQ-SEL | P.L. Nyimbili Enterprises | QTZ, SIL | 36.6711 ha | Copperbelt, Kitwe | Deferred | 9th DECEMBER, 2024 |
43 | 36768-HQ-SEL | Fulgent Mining Limited (100%) | Ag, AMT, Au, Co, Cu, EM | 384.2522 ha | Copperbelt, Lufwanyama | Deferred | 9th DECEMBER, 2024 |
44 | 36831-HQ-SEL | Louis Mining Company Limited | Ag, Au, Cu, Mn | 997.9873 ha | Central, Mkushi | Deferred | 9th DECEMBER, 2024 |
45 | 36873-HQ-SEL | Starshine Mineral Resources Limited (100%) | Au, Co, Cu, Fe, Mn, Zn | 476.3239 ha | Central, Chibombo | Deferred | 9th DECEMBER, 2024 |
46 | 36928-HQ-SEL | Bauxite Mining Limited (100%) | Au, Co, Cu | 565.2194 ha | Northern, Luwingu | Deferred | 9th DECEMBER, 2024 |
47 | 36934-HQ-SEL | Changa Mining Limited | Ag, Au, Co, Cu, Fe, Mn, Ni, Zn | 209.8071 ha | North Western, Kabompo | Deferred | 9th DECEMBER, 2024 |
48 | 36935-HQ-SEL | Changa Mining Limited | Ag, Au, Co, Cu, Fe, Mn, Ni, QTZ, Zn | 905.8764 ha | North Western, Kabompo | Deferred | 9th DECEMBER, 2024 |
49 | 36937-HQ-SEL | Kalahari Engineering Worx Limited | Au, Co, Cu | 10.0396 ha | Northern, Mpika | Deferred | 9th DECEMBER, 2024 |
50 | 36955-HQ-SEL | Kuwomboka Mining and Exploration Limited | AQM, Au, Co, Cu, Ta | 126.2153 ha | Eastern, Petauke | Deferred | 9th DECEMBER, 2024 |
51 | 36972-HQ-SEL | Zam-Kirin Mining Limited | AQM, Be3Al2(SiO3)6, EM, QTZ, TML | 403.3018 ha | Copperbelt, Lufwanyama | Deferred | 9th DECEMBER, 2024 |
52 | 36990-HQ-SEL | Nyungu Mining Multi-purpose Limited (100%) | Au, Co, Cu, EM, Fe, Ni, Zn | 908.5101 ha | North Western, Solwezi | Approved | 9th DECEMBER, 2024 |
53 | 37065-HQ-SEL | Simba Venture Limited (100%) | AMT, Au, Co, COA, Cu, Fe, Li, Mn, Pb, Zn | 358.7483 ha | North Western, Kasempa | Deferred | 9th DECEMBER, 2024 |
54 | 37089-HQ-SEL | Silver Pearl Motors Limited (100%) | Au, Co, Cu, DIA | 964.0467 ha | Northern, Mpika | Deferred | 9th DECEMBER, 2024 |
55 | 37373-HQ-SEL | Tangshan Resources Limited (100%) | COA, Cu, SIL, U, Zn | 19.9500 ha | Copperbelt, Mpongwe | Deferred | 9th DECEMBER, 2024 |
56 | 37383-HQ-SEL | Israjah Enterprises Limited (100%) | Au, Co, COA, Cu, Fe, GRT, Mn, Pb, Zn | 747.1100 ha | Central, Kapiri Mposhi | Deferred | 9th DECEMBER, 2024 |
57 | 37385-HQ-SEL | Israjah Enterprises Limited (100%) | Au, Co, COA, Cu, EM, Fe, Mn, Pb | 993.0200 ha | Central, Mkushi | Deferred | 9th DECEMBER, 2024 |
58 | 37478-HQ-SEL | NIANG MINING VENTURES LIMITED (100%) | Au, Co, Cu, EM, Fe, Mn, Pb | 813.7700 ha | Copperbelt, Lufwanyama | Deferred | 9th DECEMBER, 2024 |
59 | 37590-HQ-SEL | Zimasi Resources Limited (100%) | Au, Cu, Fe | 145.2189 ha | Central, Mumbwa | Approved | 9th DECEMBER, 2024 |
60 | 37597-HQ-SEL | CBK Holding and Mineral Resources Limited (100%) | Ag, Au, Co, Cu, Fe, LST, Pb, Zn | 250.1100 ha | Copperbelt, Ndola | Approved | 9th DECEMBER, 2024 |
61 | 37641-HQ-SEL | CHATHAN MINING LIMITED (100%) | Au, Co, Cu, Fe, Mn, Ni | 298.1700 ha | Central, Kapiri Mposhi, Mkushi | Approved | 9th DECEMBER, 2024 |
63 | 37685-HQ-SEL | Mohafra Mining Limited (100%) | AMT, AQM, Au, Co, COA, Cu, EM, Fe, Gr tourm, Li, Mn, Ni, Pb, Sn, Ti, TML, W | 45.5978 ha | Southern, Sinazongwe | Approved | 9th DECEMBER, 2024 |
64 | 37687-HQ-SEL | Mulundu Mineral Resources Limited (100%) | Ag, Al, Au, Co, Cu, Cu2CO3(OH)2, LST, Ni, Pb, Sand, Zn | 959.6300 ha | Central, Mkushi | Deferred | 9th DECEMBER, 2024 |
65 | 37713-HQ-SEL | SDLG INVESTMENTS LIMITED (100%) | Ag, Au, Cu, Mn, Ni, Pb, Zn | 209.2500 ha | North Western, Kasempa | Deferred | 9th DECEMBER, 2024 |
66 | 37737-HQ-SEL | Copper Rockfield Mines Ltd (100%) | Au, Co, COA, Cu, GRF, GYP, LST, Mn, Pb, QTZ, Sn, Ta, TML | 959.3200 ha | Lusaka, Chongwe | Deferred | 9th DECEMBER, 2024 |
67 | 37740-HQ-SEL | Zamafa Natural Resources Limited (100%) | Ag, Au, Co, Cu, KNa2, LST, Mn, MS, Ni, Pb, TML, Zn | 366.4300 ha | Central, Mkushi | Rejected | 9th DECEMBER, 2024 |
68 | 37825-HQ-SEL | Mohafra Mining Limited (100%) | AMT, AQM, Co, COA, Cu, Gr tourm, Li, Mo, Ni, REE, SIL, Sn, Ti, TML, W | 97.7406 ha | Southern, Kalomo | Deferred | 9th DECEMBER, 2024 |
69 | 37856-HQ-SEL | Uniturtle Industries Zambia Limited (100%) | DOL, LST | 51.1500 CU | Southern, Mazabuka | Approved | 9th DECEMBER, 2024 |
70 | 37878-HQ-SEL | ALLISWELL INVESTMENTS LIMITED (100%) | Au, Co, COA, Cu, Cu2CO3(OH)2, Zn | 16.6800 ha | Copperbelt, Kalulushi | Rejected | 9th DECEMBER, 2024 |
71 | 38071-HQ-SEL | OUEST BUSINESS LIMITED (100%) | Au, Co, COA, Cu, EM, Fe, Mn, Pb | 905.9600 ha | Northern, Kasama | Approved | 9th DECEMBER, 2024 |
72 | 38088-HQ-SEL | Brxton Construction Limited (100%) | Au, Co, Cu, Fe, Mn, Ni, Zn | 521.7000 ha | North Western, Mufumbwe | Approved | 9th DECEMBER, 2024 |
73 | 38098-HQ-SEL | Vatech Limited (100%) | Ag, Au, Co, Cu, Cu2CO3(OH)2, Fe, LST, Ni, Pb, Zn | 69.4300 ha | Central, Mumbwa | Approved | 9th DECEMBER, 2024 |
74 | 38099-HQ-SEL | Vatech Limited (100%) | Ag, Au, Co, Cu, Cu2CO3(OH)2, Fe, LST, Ni, Pb, PYR, Zn | 830.5000 ha | Central, Mumbwa | Approved | 9th DECEMBER, 2024 |
75 | 38100-HQ-SEL | Afrimuk Company Limited (100%) | Ag, Au, Co, Cu, Cu2CO3(OH)2, Fe, LST, Ni, Pb, Zn | 86.6600 ha | Copperbelt, Ndola | Deferred | 9th DECEMBER, 2024 |
76 | 38204-HQ-SEL | JABOST GENERAL TRADERS LIMITED (100%) | Au, Co, Cu, Mn, Zn | 39.7000 ha | Central, Mumbwa | Rejected | 9th DECEMBER, 2024 |
77 | 38298-HQ-SEL | Silver Pearl Motors Limited (100%) | Ag, AMT, Au, Co, Cu, Cu2CO3(OH)2, EM, F, Gravel, Mn, Ni, Pb, QTZ, Sand, SUL, TML, Zn | 787.3600 ha | Lusaka, Chongwe | Deferred | 9th DECEMBER, 2024 |
78 | 38299-HQ-SEL | KEKI MINING LIMITED (100%) | Cu, EM, Mn | 13.4200 ha | Luapula, Mansa | Approved | 9th DECEMBER, 2024 |
79 | 38300-HQ-SEL | KEKI MINING LIMITED (100%) | Au, Co, Cu, Mn | 267.1300 ha | Central, Serenje | Approved | 9th DECEMBER, 2024 |
80 | 38315-HQ-SEL | Nachibila Resources Limited (100%) | Au, CC, Co, Cu, Mn, TML, Zn | 43.6300 ha | Northern, Chinsali | Approved | 9th DECEMBER, 2024 |
81 | 38347-HQ-SEL | Leroy Minerals Logistics And Construction Limited (100%) | Ag, Au, Co, Cu, Fe, Mn, Zn | 888.7400 ha | Luapula, Mwense | Deferred | 9th DECEMBER, 2024 |
82 | 38348-HQ-SEL | Leroy Minerals Logistics And Construction Limited (100%) | Ag, Au, Co, Cu, Fe, Mn, Pb, Zn | 952.1100 ha | Luapula, Mwense | Deferred | 9th DECEMBER, 2024 |
83 | 38349-HQ-SEL | Chikonka copper mines Limited (100%) | AQM, Au, Be3Al2(SiO3)6, Co, Cu, Cu2CO3(OH)2, Fe, GRT, Mn, Ni, QTZ | 23.2000 ha | Central, Mkushi | Approved | 9th DECEMBER, 2024 |
84 | 38380-HQ-SEL | Nachibila Resources Limited (100%) | Au, Co, Cu, DIA, EM, KNa2, Mn, MS, Pb, TML, Zn | 90.5600 ha | Northern, Chinsali | Approved | 9th DECEMBER, 2024 |
85 | 38422-HQ-SEL | BUTTERFLY COPPER MINING LIMITED (100%) | Au, Cu | 19.8500 ha | Central, Mkushi | Approved | 9th DECEMBER, 2024 |
86 | 38436-HQ-SEL | MWILA J. CIVILS LIMITED (100%) | CLY4, DOL, FLD, GRT, LST | 275.7200 ha | Northern, Isoka | Approved | 9th DECEMBER, 2024 |
87 | 38437-HQ-SEL | ECOSAN Development and Trading Limited (100%) | AMT, AQM, Au, Co, Cu, Fe, GAR, Li, MIC, Mn, Pb, QTZ, Sn, Ta | 795.4600 ha | Northern, Mpika | Approved | 9th DECEMBER, 2024 |
88 | 38453-HQ-SEL | Sherco investment limited (100%) | Ag, Au, Co, Cu, Pb, Zn | 318.0400 ha | Central, Kapiri Mposhi | Approved | 9th DECEMBER, 2024 |
89 | 38468-HQ-SEL | Mboo Investments Limited (100%) | Ag, Au, COA, Cu, LST, Mn, Ni, TML, Zn | 773.6800 ha | Copperbelt, Masaiti, Ndola | Approved | 9th DECEMBER, 2024 |
90 | 38469-HQ-SEL | Genem MINERAL LIMITED (100%) | Au, Cu, QTZ, Zn | 10.0500 ha | North Western, Mwinilunga | Approved | 9th DECEMBER, 2024 |
91 | 38485-HQ-SEL | Lukabu Westlake enterprises (100%) | Ag, Al, Au, Ca, Co, COA, Cu, DIA, EM, Fe, Gravel, LST, Mn, Ni, Pb, Sand, STN1, Zn | 954.4400 ha | Northern, Kaputa | Approved | 9th DECEMBER, 2024 |
92 | 38488-HQ-SEL | Bin Ajilu Enterprises Limited (100%) | Ag, Au, Co, Cu, Ni, Zn | 267.9600 ha | Lusaka, Chongwe | Deferred | 9th DECEMBER, 2024 |
93 | 38495-HQ-SEL | Maricep Investments Zambia Limited (100%) | Ag, Au, Co, Cu, DOL, Fe, Ni, Zn | 427.5100 ha | North Western, Solwezi | Approved | 9th DECEMBER, 2024 |
94 | 38496-HQ-SEL | Maricep Investments Zambia Limited (100%) | Ag, Au, Co, Cu, DOL, Fe, GRT, Pb, Sand, Zn | 720.1800 ha | North Western, Solwezi | Approved | 9th DECEMBER, 2024 |
95 | 38498-HQ-SEL | Maricep Investments Zambia Limited (100%) | Ag, Au, Co, Cu, Fe, LST, Ni, Sn, Zn | 299.1700 ha | Southern, Mazabuka | Approved | 9th DECEMBER, 2024 |
96 | 38499-HQ-SEL | Lawgum Investments Limited (100%) | AMT, Au, Co, Cu, Cu2CO3(OH)2, EM, Fe, LST, Mn, Pb, QTZ, Sn, Ta, Zn | 83.3600 ha | Copperbelt, Kalulushi | Approved | 9th DECEMBER, 2024 |
97 | 38502-HQ-SEL | KEMUFU MINING LIMITED (100%) | Ag, Au, Co, Cu, DIA, EM, Mn, Ni, Pb, Zn | 71.9500 CU | North Western, Solwezi | Deferred | 9th DECEMBER, 2024 |
98 | 38532-HQ-SEL | Luwi Investments Limited (100%) | Au, Cu, Cu2CO3(OH)2, Fe, LST, Mn, Pb, QTZ, Sand, Zn | 548.5900 ha | Lusaka, Chongwe | Deferred | 9th DECEMBER, 2024 |
99 | 38533-HQ-SEL | Luwi Investments Limited (100%) | Au, Co, Cu, Fe, LST, Mn, Pb, QTZ, Sand, Sn, TML, Zn | 601.6100 ha | Lusaka, Chongwe | Deferred | 9th DECEMBER, 2024 |
100 | 38536-HQ-SEL | Colchi Farms Limited (100%) | Au, Co, Cu, Gravel, LST, MS, Sand | 207.7200 ha | Lusaka, Chongwe | Rejected | 9th DECEMBER, 2024 |
101 | 38552-HQ-SEL | Maricep Investments Zambia Limited (100%) | Ag, AQM, Au, Bi, Cu, Fe, MIC, Pb, QTZ, Zn | 948.3000 ha | Eastern, Katete | Approved | 9th DECEMBER, 2024 |
102 | 38561-HQ-SEL | Bright Sky Mining Limited (100%) | Ag, Au, Co, COA, Cu, Cu2CO3(OH)2, EM, Fe, Gravel, LST, Mn, Ni, Pb, TML, Zn | 949.1800 ha | Central, Kapiri Mposhi | Approved | 9th DECEMBER, 2024 |
103 | 38575-HQ-SEL | Sherco investment limited (100%) | Au, Cu, Pb, Zn | 927.0700 ha | Central, Kabwe | Approved | 9th DECEMBER, 2024 |
104 | 38597-HQ-SEL | Sun Park Development Limited (100%) | Ag, Au, CC, Co, Fe, Mn, Ni, Zn | 307.3300 ha | Central, Mumbwa | Deferred | 9th DECEMBER, 2024 |
105 | 38599-HQ-SEL | SIRMUSA MINERALS LIMITED (100%) | Ag, Au, Co, Cu, Cu2CO3(OH)2, Fe, KNa2, Mn, Ni, TML, Zn | 46.8600 ha | North Western, Solwezi | Approved | 9th DECEMBER, 2024 |
106 | 38606-HQ-SEL | Mboo Investments Limited (100%) | Ag, AMT, Au, COA, Cu, DOL, Fe, FLD, FLN, LST, Mn, Ni, QTZ, REE, Sand, TML, Zn | 807.8300 ha | Northern, Isoka | Approved | 9th DECEMBER, 2024 |
107 | 38619-HQ-SEL | Leroy Minerals Logistics And Construction Limited (100%) | Ag, Au, Co, Cu, DOL, Fe, Mn, Zn | 40.0800 ha | Central, Serenje | Deferred | 9th DECEMBER, 2024 |
108 | 38670-HQ-SEL | GOLDEN GRIDLINES SOLUTIONS LIMITED | Au, Co, COA, Cu | 312.6500 ha | Southern, Sinazongwe | Approved | 9th DECEMBER, 2024 |
109 | 38689-HQ-SEL | Silondwa Safaris Limited (100%) | CLY, GYP, LST, TLC | 865.1000 ha | Southern, Monze | Approved | 9th DECEMBER, 2024 |
110 | 38696-HQ-SEL | Gracious Green Farm Linted (100%) | Au, Co, Cu, Fe, Mn, Pb, QTZ, Zn | 281.6400 ha | Luapula, Milenge | Rejected | 9th DECEMBER, 2024 |
111 | 38703-HQ-SEL | Fouta Mining Limited (100%) | Au, Co, Cu, EM, Fe, Mn, Pb | 810.4600 ha | North Western, Mwinilunga | Approved | 9th DECEMBER, 2024 |
112 | 38710-HQ-SEL | Kyandanshi Investment Limited (100%) | Ag, Au, CC, Co, COA, Cu, Cu2CO3(OH)2, DIA, EM, Fe, Gravel, LST, Mn, Pb, Sand, Zn | 49.7900 ha | North Western, Kasempa | Approved | 9th DECEMBER, 2024 |
113 | 38720-HQ-SEL | Mabwetuba Investments Limited (100%) | Au, Co, Cu, EM, Fe, Ni, Zn | 888.2900 ha | North Western, Solwezi | Approved | 9th DECEMBER, 2024 |
114 | 38722-HQ-SEL | Fouta Mining Limited (100%) | Au, Co, Cu, EM, Fe, Mn, Pb, Zn | 987.2800 ha | Central, Kapiri Mposhi | Approved | 9th DECEMBER, 2024 |
115 | 38737-HQ-SEL | JP MINERAL AND REFINERY LIMITED (100%) | Ag, AMT, AQM, Au, Co, COA, Cu, Fe, GRF, GRT, GYP, Mn, Pb, QTZ, Ta | 962.7800 ha | Central, Chibombo | Rejected | 9th DECEMBER, 2024 |
116 | 38738-HQ-SEL | Goldbelt Mining Industries Limited (100%) | Ag, AMT, AQM, Au, Co, COA, Cu, Fe, GRF, GRT, GYP, LST, Mn, Pb, QTZ, Ta | 873.3600 ha | Central, Chibombo | Rejected | 9th DECEMBER, 2024 |
117 | 38788-HQ-SEL | Pure Stone Mining Limited (100%) | Au, Co, Cu, Fe | 564.3011 ha | Central, Mumbwa | Approved | 9th DECEMBER, 2024 |
118 | 38789-HQ-SEL | Blue Flag Investments Limited (100%) | Au, Co, Cu, Fe | 811.8603 ha | Central, Mumbwa | Approved | 9th DECEMBER, 2024 |
119 | 38790-HQ-SEL | Dibri Investment Limited (100%) | Ag, Au, Co, Cu, EM, Fe | 117.3700 ha | Southern, Kalomo | Approved | 9th DECEMBER, 2024 |
120 | 38817-HQ-SEL | Minicom Technologies Limited (100%) | Au, Co, Cu, Ni, QTZ, Zn | 268.1500 ha | North Western, Mwinilunga | Approved | 9th DECEMBER, 2024 |
121 | 38819-HQ-SEL | Anchor Resources Limited (100%) | Au, Cu, Fe | 393.7400 ha | Central, Chibombo | Approved | 9th DECEMBER, 2024 |
122 | 38826-HQ-SEL | Anchor Resources Limited (100%) | AMT, Au, Cu, Gravel, TML | 512.8100 ha | Central, Chibombo | Deferred | 9th DECEMBER, 2024 |
123 | 38829-HQ-SEL | FORLUK VENTURES LIMITED (100%) | Au, Co, Cu, Fe, Ni | 227.9000 ha | North Western, Mwinilunga | Approved | 9th DECEMBER, 2024 |
124 | 38830-HQ-SEL | Lukabu Westlake enterprises (100%) | Ag, Au, Co, COA, Cu, DIA, EM, Fe, GAS, Gravel, I, LST, LST1, Mn, Ni, OIL, Pb, Sand, SDG, SIL, SLF, S | 863.1700 ha | Northern, Kaputa | Approved | 9th DECEMBER, 2024 |
125 | 38834-HQ-SEL | Jewel of Africa Limited (100%) | Au, Cu, Cu2CO3(OH)2, EM, Mn, Pb, Zn | 539.4300 ha | Copperbelt, Lufwanyama, Masaiti | Approved | 9th DECEMBER, 2024 |
126 | 38857-HQ-SEL | Jewel of Africa Limited (100%) | Au, Co, COA, Cu, Cu2CO3(OH)2, EM, Pb, Zn | 179.9100 ha | Copperbelt, Lufwanyama | Approved | 9th DECEMBER, 2024 |
127 | 38860-HQ-SEL | GREAT TECH ZAMBIA LIMITED | Ag, Au, Co, Cu, Fe, Mn, Pb, Zn | 990.0100 ha | Central, Kabwe | Approved | 9th DECEMBER, 2024 |
128 | 38861-HQ-SEL | GREAT TECH ZAMBIA LIMITED | Ag, Au, Co, Cu, LST, Mn, Zn | 216.0500 ha | Copperbelt, Masaiti, Mpongwe | Deferred | 9th DECEMBER, 2024 |
129 | 38862-HQ-SEL | GREAT TECH ZAMBIA LIMITED | Ag, Au, Co, COA, Cu, Fe, Mn, Pb, Zn | 39.6800 ha | Central, Mumbwa | Deferred | 9th DECEMBER, 2024 |
130 | 38863-HQ-SEL | GREAT TECH ZAMBIA LIMITED (100%) | Au, Co, Cu, Mn, Pb, Zn | 140.2600 ha | Copperbelt, Mufulira | Deferred | 9th DECEMBER, 2024 |
131 | 38865-HQ-SEL | Siam Mining Zambia Limited (100%) | Ag, AMT, Au, COA, Cu, EM, Sn, Ta, TML, W | 235.3400 ha | Southern, Choma, Sinazongwe | Approved | 9th DECEMBER, 2024 |
132 | 38882-HQ-SEL | Mboo Investments Limited (100%) | Au, Co, Cu | 436.9600 ha | Central, Mumbwa | Approved | 9th DECEMBER, 2024 |
133 | 38887-HQ-SEL | Wealth Front Resources Limited (100%) | Au, Co, Cu, Fe, Mn | 232.5600 ha | Central, Mkushi | Approved | 9th DECEMBER, 2024 |
134 | 38893-HQ-SEL | Afrique Nama Mining Limited (100%) | Ag, Au, Co, Cu, Fe, Mn, Pb, Zn | 397.4216 ha | Central, Serenje | Approved | 9th DECEMBER, 2024 |
135 | 38924-HQ-SEL | Anchor Resources Limited | AL1, AMT, AQM, Au, Cu, EM, Fe, FLD | 919.4100 ha | Central, Chibombo | Deferred | 9th DECEMBER, 2024 |
136 | 38925-HQ-SEL | Zamvictory Investments Limited (100%) | Au, Be3Al2(SiO3)6, Co, Cu, EM, Fe, Ni, Sn | 534.9600 ha | Central, Mkushi | Approved | 9th DECEMBER, 2024 |
137 | 38973-HQ-SEL | Blinkasset Enterprises Limited (100%) | Ag, Au, Co, Cu, Fe, GEM, Mn, Ni, Zn | 554.6600 ha | Central, Mumbwa | Approved | 9th DECEMBER, 2024 |
138 | 38974-HQ-SEL | JOUVENCE PETROLEUM ZAMBIA LIMITED | Ag, Au, Co, Cu, GRF, Mn, Nb, Pb, Sb, Sn, Ta, TML, W | 543.6305 ha | Central, Mkushi | Approved | 9th DECEMBER, 2024 |
139 | 38998-HQ-SEL | Expat Management Services Limited | Ag, Au, Co, Cu, Fe, Ni, QTZ, Zn | 891.9300 ha | Central, Mumbwa | Approved | 9th DECEMBER, 2024 |
140 | 39007-HQ-SEL | Forward Mining Limited (100%) | Ag, Au, Co, Cu, Zn | 645.4700 ha | North Western, Solwezi | Approved | 9th DECEMBER, 2024 |
141 | 39008-HQ-SEL | FORLUK VENTURES LIMITED (100%) | Ag, Au, Co, Cu, Cu2CO3(OH)2, Fe, Ni, Zn | 696.7000 ha | North Western, Mwinilunga | Approved | 9th DECEMBER, 2024 |
142 | 39021-HQ-SEL | Gracious Green Farm Limited (100%) | Ag, Au, Co, Cu, Cu2CO3(OH)2, Fe, Ni, Zn | 522.78 ha | North Western, Mwinilunga | Approved | 9th DECEMBER, 2024 |
143 | 39024-HQ-SEL | Minache Resources Limited | Au , Cu | 147.56 ha | Northern, Chinsali | Approved | 9th DECEMBER, 2024 |
144 | 39025-HQ-SEL | Elikace Mining Limited | Au , Cu | 160.98 ha | Northern, Chinsali | Approved | 9th DECEMBER, 2024 |
145 | 39026-HQ-SEL | Mighte General Dealers and Suppliers | Au , Cu | 201.23 ha | Northern, Chinsali | Approved | 9th DECEMBER, 2024 |
146 | 39028-HQ-SEL | Curprite Geoservices Limited | Au , Cu | 919 ha | Northern, Chinsali | Approved | 9th DECEMBER, 2024 |
147 | 38772-HQ-SEL | Golden Leopard Mining Industry Limited (100%) | Au, Co, COA, Cu, Sn, Zn | 978.3700 ha | Southern, Sinazongwe | Approved | 9th DECEMBER, 2024 |